Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />desirable; however, no major complication in dam and spillway <br />layout is anticipated. <br /> <br />Except at the far upstream end of the enlarged reservoir, no <br /> <br />presently state-owned property line will be encroached by the <br /> <br />maximum flood level of 6373.9 feet. <br /> <br />4. Additional Land Acquisition. To eliminate the possibility of inundating <br /> <br /> <br />the land owned by others, additional land acquisition at the upstream <br /> <br /> <br />reach of the reservoir would require 320 acres for (2) 350 MW and <br /> <br /> <br />640 acres for (4) 350 MW plant operations. <br /> <br />5. Estimated Additional Project Cost. An additional project cost of <br /> <br /> <br />$317,000 is estimated for (2) 350 MW storage and $572,100 for <br /> <br /> <br />(4) 350 MW storage. The quantity take-off and cost breakdown are <br /> <br /> <br />listed in Tables A-3 and A-4, Appendix A. <br /> <br /> <br />5 <br />