My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00370
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0031X
Contractor Name
Yampa Project DNR 1972
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />desirable; however, no major complication in dam and spillway <br />layout is anticipated. <br /> <br />Except at the far upstream end of the enlarged reservoir, no <br /> <br />presently state-owned property line will be encroached by the <br /> <br />maximum flood level of 6373.9 feet. <br /> <br />4. Additional Land Acquisition. To eliminate the possibility of inundating <br /> <br /> <br />the land owned by others, additional land acquisition at the upstream <br /> <br /> <br />reach of the reservoir would require 320 acres for (2) 350 MW and <br /> <br /> <br />640 acres for (4) 350 MW plant operations. <br /> <br />5. Estimated Additional Project Cost. An additional project cost of <br /> <br /> <br />$317,000 is estimated for (2) 350 MW storage and $572,100 for <br /> <br /> <br />(4) 350 MW storage. The quantity take-off and cost breakdown are <br /> <br /> <br />listed in Tables A-3 and A-4, Appendix A. <br /> <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.