Laserfiche WebLink
<br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and lOB~, and against all <br />claims and actions hased upon or arising out of damage or <br />injury, incluning death, to pe("~ons or pr.operty caused by oc <br />sustainBd in connection with the performance of any subcontcact <br />or hy connitions crp.aten thereby, or based upon any violat.ion <br />of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />4. Require all Subcontractors to maintain liability <br />insurance in at least the following amounts: <br /> <br />a. For any inj ury to one person in any sing Ie <br />occurrence, the sum of On~ Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any injury to two or more persons in any <br />singlp. occurrence, the sum of Pour Hundred Thousand <br />Dollars ($400,000). <br /> <br />Said liability insurance shall name the Contractor and <br />the State as co-insureds. No payments shall be made under this <br />contract unless a copy of a certificate of said liability <br />insurance has been filed with the Colorado Water Conservation <br />Board. <br /> <br />s. Conveyor cause title to be conveyed by warranty deed <br />to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the <br />proposed project facilities within thirty (30) days of their <br />complet ion: <br /> <br />a. II 500,000 gallon tank with yard piping, to be <br />located within the city limits of Manitou Springs. <br /> <br />b. A three-million-gallon-per-day treatment <br />facility, in the general vicinity to the existing <br />tank as shown in Appendix A. <br /> <br />The warranty deed must be recorded by the Contractor <br />in the proper county or counties and all transfer taxes shall <br />be paid by the Contractor. <br /> <br />6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State, manage, operate, and <br />maintain the project system continuously in an efficient and <br />economical mann~r, and assume all legal liability for such <br />management, operation, and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's ownership of the project facilities <br />identified in paragraph ~ above. The Contractor shall maintain <br />general liability insurance covering the management, operation, <br />and maintenance of the project system until it has completed <br />purchase of the project system from the State in at least the <br />following amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars ($400,000). <br /> <br />Page 2 0 f 7 paqes <br />