Laserfiche WebLink
<br />Fonn b-AC.tl2A (R 5/85) <br /> <br />,-. <br />VEI'AI-' ."FNT OR AG1o:NCY NlJM "-It <br /> <br />.1>....... f' <br /> <br />~ f <br /> <br />04-00 . <br />CONTRAC r ROUTINl; NUMBER <br />:?,l2(" <br /> <br />SECOND <br /> <br />PROJECT <br />CONTRACT AMENDMENT <br /> <br />$100,000 additional <br />C/5-33 '(7 <br /> <br />THIS CONTRACT, made this ? ~t-n day of Februarv 198....Q.., by and between lhe <br />Stale of Colorado for lhe u~e and benefit of the Deparlmenl of "1 Natural Resources <br />(Colorado Water Conservation Board) . <br />hereinafter referred to as the St;tte, and '2 _.the Ci tv of Manitou Sprinas. <br />fiOfi Manitou Avenue. Manitou Sorinas. CO 80829. <br />ht>reinaflcr referred 10 as the contractor, <br /> <br />WHEREAS, authnrity exists in the law and Funds have been budgeted, appropriated and olherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund Number 4008 <br />G/l Account Number 53 lOX ,Col\tracl Encumbrance Number 153397: and <br />ABL Account Number 13100, Org. Unit 77-77-777, <br />WHEREAS, re'luirl'd approval. c1ear:lIlce and coordination has been accomplished from and wilh appropriate <br />agencies: and <br /> <br />WHEREAS, the State and the Contractor did on October 1, <br />1982, enter into a contract for State participation in the <br />improvement of the water supply system of the Contractor for <br />the benefit of its citizens; and <br /> <br />WHEREAS, the State and the Contractor did on March 1, <br />1985, enter into a contract amendment for an additional State <br />participation of One Hundred Thousand Dollars ($100,000) in the <br />improvements of the water supply system of the Contractor for <br />the benefit of its citizens, which increase was based on the <br />State's estimate that the cost indices for the project had <br />increased by at least ten percent (10%), and in fact had <br />increased by more than ten percent (10%); and <br /> <br />WHEREAS, Senate Bill 67 (1980 Session), which authorized <br />the project, also provided that the authorized amount of One <br />Million Dollars ($1,000,000) could be increased or decreased by <br />"... such amounts, if any, as may be justified by reason of <br />ordinary fluctuations in construction costs as indicated by <br />engineering cost indices applicable to the types of <br />construction involved for such projects .... II; and <br /> <br />WHEREAS, the State staff has verified that the cost <br />indices for this project have increased from the time that the <br />project was authorized to the time the project was hid by <br />twenty percent "(20%) of the total project cost: and <br /> <br />WHEREA~, the Contractor wishes to add certain components <br />to the project, which additions were contemplated by the <br />original feasibility study but were not included under the <br />initial project plans because of cost considerations on the <br />part of the Contractor: and <br /> <br />WHEREAS, the City of Manitou Springs has now determined <br />that it can afford to complete the entire project contemplated <br />by the feasibility study; and <br /> <br />WHEREAS, the additional money provided by this contract <br />amendment covers the total estimated increase in the cost <br />indices for the project contemplated by the feasibility study, <br />which project includes the additions to be made by the <br />Contractor. <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />A. The original contract as amended (Exhibit A) is amended <br />as follows: <br /> <br />Paragraph AS shall read: <br /> <br />A.S. <br /> <br />Conveyor cause title to be conveyed by warranty <br /> <br />395-53-0HO"14 <br /> <br />Page J of2pages <br />*(Sceinstwctiunson reverscof lasl page.l <br /> <br />310 <br />am/m/sp <br />