My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00366
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0006X
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3.0 PREVIOUS STUDIES <br /> <br />3.1 GENERAL <br /> <br />Five prior engineering studies have been conducted for water agencies within the boundaries of the <br />SJWCD. Additionally, the PAWSD issued a Preliminary Official Statement (for $1,400,000 in new <br />debt obligations) dated September 1992. These are listed below and summarized in the following <br />sections. <br /> <br />(1) Archuleta Water Company Water Treatment Alternatives - December 1984. Prepared for <br />the Southwestern Water Conservancy District by Harris Water Engineering. <br /> <br />(2) Hidden Valley Reservoir Appraisal Level Evaluation of Reservoir Water Yield for SJWCD - <br />October 1988. Prepared by Harris Water Engineering. <br /> <br />(3) Preliminary Engineering Study of PAWSD for Domestic Water Supply Facilities - January <br />1989. Prepared by Davis Engineering Service, Inc. <br /> <br />(4) Alternative Reservoir Evaluation Appraisal Level Study for SJWCD - August 1989. <br />Prepared by Harris Water Engineering. <br /> <br />(5) Engineering Study of Town of Pagosa Springs and Archuleta Water Company Water <br />Systems - May 1992. Prepared by Davis Engineering Service, Inc. <br /> <br />(6) Preliminary Official Statement dated September 1992 for $1,400,000 PAWSD General <br />Obligation Bonds, Series 1992, Prepared by Hannifen, Imhoff Inc. <br /> <br />Each of these studies are summarized in the following sections. <br /> <br />3.2 ARCHULETA WATER COMPANY WATER TREATMENT ALTERNATIVES STUDY <br /> <br />The Archuleta Water Company (A WC) provides domestic water to areas surrounding Pagosa Springs, <br />Colorado. This study investigated three alternatives for providing treated water to A WC in lieu of <br />receiving continued water service from the Town of Pagosa Springs. It investigated the costs to <br />convey, treat, transport, and pump water to the A WC customers and compared these costs for the <br />Power Plant site (located near the La Plata Electric hydro power plant south of town), the "Y" site <br />(located at the intersection of Highways 160 and 84), and the upstream site (involving the purchase of <br /> <br />3-1 <br /> <br />S9S\PAGOSA FS\S3,TXT <br />10/27/'J2 mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.