My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00366
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0006X
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDM <br /> <br />RECEIVED <br />APR 0 2 1997 <br /> <br />CAMP DRESSER & McKEE INC. <br /> <br />environmental engineers. scientists, <br />planners. & management consultants <br /> <br />Colorado Water <br />Conservation Board <br /> <br />133117th Street, Suite 1200 <br />Denver, Colorado 80202 <br />303298-1311, Fax: 303 293-8236 <br /> <br />October 27, 1992 <br /> <br />Mr. Frank Akers <br />Colorado Water Conservation Fund <br />1313 Sherman Stree4 Room 721 <br />Denver, CO 80203 <br /> <br />SUBJECT: Hidden Valley Reservoir and Stevens Lake Dam Enlargement <br />Feasibility Study for CWCB Construction Fund Loan <br /> <br />Dear Mr. Akers: <br /> <br />On behalf of our clients, the Pagosa Area Water and Sanitation District (pAWS D) and the San Juan <br />Water Conservancy District (SJWCD), Camp Dresser & McKee Inc. is pleased to submit this final <br />report documenting the results of the Feasibility Study - Hidden Valley Reservoir and Stevens Lake <br />Dam Enlargement. ' <br /> <br />As stated in the report, the conclusion of the study is that the proposed project - construction of a new <br />dam and reservoir at Hidden Valley and enlargement of the existing dam and reservoir at Stevens Lake <br />- is feasible, The recommendation has therefore been made that the PAWSD and SJWCD proceed <br />with their application to finance this project through the CWCB Construction Fund Loan Program, <br /> <br />As you review this report, please don't hesitate to callMr. DeLange or me if you have any questions <br />or require additional information. <br /> <br />Sincerely, <br />CAMP DRESSER & McKEE INC. <br /> <br />f1IL 4' .Jtt/ <br /> <br />Joseph S, Stibrich, P.E. <br />Principal Engineer <br />Project Manager <br /> <br />enclosure <br /> <br />cc: Jack DeLange - PAWSD/SJWCD <br /> <br />Printed on ~vt'!IAH NInA' <br />
The URL can be used to link to this page
Your browser does not support the video tag.