My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00365
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153305
Contractor Name
Dolores Water Conservancy District
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DOLORES WATER <br />HOD r,' ICATItJNS <br />PAGE ) <br /> <br />CONS.~"CY <br />TO CONTRACT <br /> <br />DISTRICT <br /> <br />.- <br /> <br />February 9, 1979 <br /> <br />.' <br /> <br />e, Plan of Development <br /> <br />(1) Physical Plan: existing system CUffijlOnents of service entitles, <br />proposed methods of s~rvice, Opt~rational methodology, alternatives <br />studied review, recummended altt~rnative <br /> <br />(2) Design: criteria and standards for sizing of plant, mains, pump- <br />ing stations, reservoirs; hydrClulics, structural; characteristics <br />of McPhee Reservoir; ava.ilability of construction materials <br /> <br />(3) Structure Plans: preliminary profiles of mains with gradient, <br />materials; schematics of plant and pumping stations <br /> <br />(4) Right-of-way: general requirements <br /> <br />f. Estimated Costs: <br /> <br />(1) Construction: unit cost derivation; quantities for system ele- <br />ments; summaries; contingencies: allowances for escalation; in- <br />terest; fees, administration <br /> <br />(2) Fund requirement schedule <br /> <br />(3) OperatLon and Maintenance: <br /> <br /> <br />(4) Emergency operating fund <br /> <br />budl~ets by cost item <br /> <br />g. <br /> <br />Project Evaluation: <br /> <br />Income, expend ltures, repayment <br /> <br />h. Financial Program: <br /> <br />(1) Allocation <br />(2) Distribution of costs <br />(3) Revenues <br />(4) Payout schedule <br /> <br />1.3. Assuming fderal funds may be incorporated in the project, Engineer's en- <br />vironmental assessment efforts will be limit2d to a Negatiye Declaration. TIlis <br />will include a summary of the purpose of the project, location, extent and nature <br />of land use changes, and major and secondary impacts~ Environmental Impact <br />Statements will be additional work; if requested~ <br /> <br />1.4. During the continuing data collection and report preparation, reports will <br />be made to the Board at least monthly~ These will include status, decision <br />items, and coordination. Periodic contact will be maintained with the staff of <br />the Colorado Water Conservation Board and Bureau of Reclamation. Coordination <br />will also be made with all existing water service agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.