My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00364
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153396
Contractor Name
Fruita, City of
Contract Type
Loan
Water District
0
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />II <br /> I <br /> I 1. <br /> 2. <br />:- 3. <br />I <br />:. 4. <br /> I 5. <br /> 6. <br /> I 7. <br /> I 8. <br /> 9. <br /> . 10. <br />:1 11. <br />il 12. <br /> I 13. <br /> I 14. <br /> . 15. <br /> I 16. <br /> I <br /> I <br /> I <br />'. <br /> ---- <br /> <br />LIST OF TABLES <br /> <br />Summary of Average Temperatures <br /> <br />Inventory of Pipelines - Existing Water <br />Distribution System <br /> <br />Estimated Future Occupancy of Fruita's Vacant <br />Land Area ' <br /> <br />Historic Population Growth <br /> <br />Population Growth Projections <br /> <br />Companies With Expansion And/Or Development <br />Plans In Mesa County <br /> <br />Water Produced/Purchased 1978 - 1980 <br /> <br />Summary Of Water Use <br /> <br />Estimated Future Water Demands Based On Full <br />Energy Impact <br /> <br />Estimated Future Water Demands Based On Steady <br />Energy Impact <br /> <br />Treated Water Storage Requirements - Full <br />Energy Impact <br /> <br />Treated Water Storage Requirements - Steady <br />Energy Impact <br /> <br />Comparison Of USGS Colorado River Analyses To <br />USPHS and EPA Water Quality Standards <br /> <br />Preliminary Capital Cost Estimate - Surface <br />Water Filtration <br /> <br />Preliminary Capital Cost Estimate - Lime Soda <br />Softening Water Treatment Plant <br /> <br />Preliminary Capital Cost Estimate - Filtration <br />Ion-Exchange Softening Water Treatment Plant <br /> <br />vi <br /> <br />Page <br />I-I <br />I II-5 <br />IV-3 <br />V-2 <br />V-3 <br />V-5 <br />V-7 <br />V-9 <br />V-13 <br />V-13 <br />V-I6 <br />V-17 <br />VI-2 <br />VI-e <br />VI -10 <br />and <br />VI -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.