Laserfiche WebLink
<br />il <br />I <br />I <br />, <br />I <br />!I <br />I <br />II <br />I <br />I <br />,I <br />,I <br />j <br /> <br />II <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SUGGESTED ORDER OF PRIORITIES <br /> <br />Oescripti6nof project <br />Phase I <br /> <br />Total <br />Estimated Costs <br /> <br />1. Replace 3,000L.F. of existing treated <br />water transmission line with 14-inch pipe. <br /> <br />$ 94,668.00 <br /> <br />2. Install 6 and 8-inch waterline in Pabor <br />Avenue during construction of sanitary <br />sewers proj ect. <br /> <br />3. Construct 1 million gallon treated water <br />storage tank. <br /> <br />133,114.00 <br /> <br />336,168.00 <br /> <br />4. Install water mains, connect dead ends to <br />increase distribution and increase pressure. <br /> <br />295,357.00 <br /> <br />5. Upgrade water distribution system by <br />replacing all cast iron pipe installed <br />pri or to 1950. <br /> <br />644,934.00 <br /> <br />Phase II <br /> <br />6-a Construct 350 gpm water treatment plant <br />addition with softening capabilities. <br /> <br />6-b Replace remaining treated water transmission <br />main with 14-inch pipe. ' , <br /> <br />7. Replace Pinion Mesa raw water pipeline. <br /> <br />979,000.00 <br /> <br />325,929.00 <br /> <br />* <br />2,489,760.00 <br /> <br />* A review of the Pinion Mesa raw water pipeline was not within the scope <br />of this project, however to assist the Town Board in this evaluation of <br />the Pinion Mesa water supply, a preliminary cost estimate was prepared. <br />The cost estimated assumed that the pipeline would have a minimum cover <br />of 4 feet from the watershed to the National Monument. In the National <br />Monument, the pipeline would parallel the road and be constructed on the <br />surface of the borrow ditch and be covered to blend in with the surround- <br />ings. <br /> <br />-7- <br />