Laserfiche WebLink
<br />MEMORANDUM <br /> <br />To: The Contract Files/:./ <br />From: Bill Green f/3 Y <br /> <br />Date: April 10, 2000 <br /> <br />Re: Contract No, 153369, St. Vrain & Left Hand Water Conservancy District <br /> <br />Date of Contract: <br /> <br />January 4, 1982 <br /> <br />Project: <br /> <br />Coffin Top Dam <br /> <br />Amount: <br /> <br />$70,000 <br /> <br />Expiration: <br /> <br />January 4, 1992 <br /> <br />This contract provides for an engineering geologic feasibility study of the Coffin Top Dam site <br />which is located on South St, Vrain Creek about one mile upstream of Lyons, The purpose of the <br />study was to assess the geologic and geotechnical conditions for construction of a large dam at <br />the Coffin Top site, Ueblacker Associates, Inc. submitted the feasibility study in June 1982. The <br />study included recommendations for a more comprehensive geologic and geotechnical analysis <br />which, to my knowledge, has never been done <br /> <br />No project has been constructed to date at the Coffin Top dam site, This contract therefore does <br />not require repayment. <br /> <br />Cc: Mike Serlet <br />Jan Illian <br />Steve Biondo <br />