Laserfiche WebLink
<br />. <br /> <br />APP}i;NDIX "A" <br />"''f<~:,.::..j./t, :~~:\f <br />" <br /> <br />. <br /> <br />ROCKY <br /> <br />MOUNTAIN~ <br />" ',. , ,-', '",~"'\'; "., ,~". . <br />~J;;<'" "',"~"'>,""'~,'~' ~';~, ..~' <br />-"..~'j>~~..,. <br />. '~~~~v '",:it">.>!,,' <br />i"'" ...",.~ <br />. '" <br />'~:i0~'l-~~i!~i: <br /> <br />~-( \ <br />, 'f" "". ...... ~ "'; <br />. . ..I f'\ f'-:~ <br />CONS UL T ANTlI~ _:'N;':;~~ <br /> <br />.: .;.. """""'4~'., <br />-o<r ~ !!f'j,(-,- - <br />", \ ., "'.;:f'J'"'~~.l.......~ <br />;l ',:,,~,:,J,':'" ,'". <br /> <br />January 15, 1981 <br /> <br />'. ,I ....~.:~_.~,. 7,"< <br />. f: " ff:,'~"----_~ <br />. <br /> <br />Mr. Nick C. Ioannides <br />Supervising Water Resource Specialist <br />COLORADO WATER CONSERVATION BOARD <br />1313 Sherman St. <br />Denver, CO 80203 <br /> <br />I ,:' <br />i, <br />, , <br /> <br />"" .l- .'~ <br /> <br />I:)", <br />..J\JJ <br /> <br />i, <br />It <br /> <br />RE : PINE BROOK WATER DISTRICT <br />FEASIBILITY STUDY <br /> <br />, <br />C\.;r'::.-.~:-.,::~'.. I:"':, :_'-J <br />".1\ V Ii TiON SOARi). <br /> <br />Dear Nick: <br /> <br />~r\. <br />. '---~ <br />:....'0 <br />":-:'::;:'li <br />- _'~*''''l <br />",.I" <br />. 7~,;:~ <br /> <br />As a result of our meeting yesterday, January 14, 1981, I <br />have revised the cost estUnate for co~pleting the Pine Brook <br />Water District Feasibility Study. The total figure that we agreed <br />upon at the meeting was reduced from my original estimate of <br />$40,483.40 to $35,995.90. Upon your receipt of this letter, we <br />would appreciate your sending a contract to the Pine Brook Water <br />District, using this figure and a starting date for the Study with <br />the same date as the contract. As we agreed at the meeting, I <br />will have the final draft ready by June 1, 1981. <br /> <br />The breakdown of the charges is as follows. The man-hour <br />estimate has also been revised to reflect the new figure. This <br />revision is also attached., <br /> <br />Principal of the Firm <br />Project Engineer <br />Design Engineer <br />Draftsman <br />2-Man Survey Party <br />Secretary <br />TOTAL <br /> <br />80 hrs. <br />240 hrs. <br />570 hrs. <br />240 hrs. <br />48 hrs. <br />136 hrs. <br /> <br />@ $50.00/hr. = <br />@ $31. 25/hr. = <br />@ $28.75/hr. = <br />@ $16.50/hr. = <br />@ $35.00/hr. = <br />@ $18.15/hr. = <br /> <br />Sincerely yours, <br /> <br />$ 4,000.00 <br />7,500.00 <br />16,387.50 <br />3,960.00 <br />1,680.00 <br />2,468.40 <br />:;;3:>,99:>.90 <br /> <br />..,-,f. <br /> <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br /> <br />~~P.E. <br /> <br />Estes Park Branch <br /> <br />GSC:pm <br />Ene. <br />cc: Trudie deHaas, PBliD <br /> <br />Longmon1 Office: , <br />500 Coffman St., Suite 107 <br />Longmont, Colorado 80501 <br />(303) 772.5282 (303) 665.6283 (Metro) <br /> <br />Denver Office: <br />4260 East Evans Avenue, Suite 7 <br />Denver, Colorado 80222 <br />(303) 758-4532 <br /> <br />. <br /> <br />...,<~ <br /> <br />Estes Park Office: <br />, P.O. Box 1649 <br />Estes Park, Colorado 80517 <br />13031..2468 (Metro) 825-8233 <br />~-'. <br />