<br />.
<br />
<br />APPENDIX uh.1I
<br />
<br />.
<br />
<br />""\,.
<br />
<br />" .'f.... . 't";,'\ ""_'-'. -'_,"
<br />' , I. \ ~",' 1/"
<br />I!"'.' .il"" ,,". ,." \' -(\., \I'~~'~
<br />~'ONSULT AN;TS"";:,,,}I~~;!:,~,,"',~:J;
<br />· ',';:' '~":'~i~'i~~i~
<br />,." ,',' ; f',i-)', ;,~~ijI ,
<br />,', ,.rr"Q,'l~~.~..~
<br />.:,. ~:.,~~,~: ,:,~.~~:~<,:: J':;-;~'.'!~':'" ',,' . ~ ~~~~eO:
<br />
<br />ROCKY
<br />
<br />MOUNTAIN'~
<br />;~',>:.~;.<~\~':'~
<br />
<br />1., ':1, ,".j,"
<br />-e.',':i,..,~ '. "'~" ~t .
<br />
<br />. " '.'~' ':."
<br />
<br />January 15, 1981
<br />
<br />Mr. Nick C. Ioannides
<br />Supervising Water Resource Specialist
<br />COLORADO WATER CONSERVATION BOARD
<br />1313 Sherman St.
<br />Denver, CO 80203
<br />
<br />RE: PINE BROOK WATER DISTRICT
<br />FEASIBILITY STUDY
<br />
<br />".'
<br />l;'.\
<br />. ..I~ ~~1~-'."~"1""
<br />,:/, 'j '1'1/.1;-.-_.....\
<br />
<br />I ,i'
<br />" ,
<br />
<br />I ~1.11 I
<br />..JVJ
<br />
<br />..
<br />I'
<br />,!
<br />
<br />'. . ;t.. .'~
<br />
<br />I
<br />L\_;;;\~:~..::~.._. ':....:; :':'.J:'
<br />",II ~'" liON SOARa
<br />
<br />"'i~:;
<br />, .::,~f>;~
<br />. -'.~ .
<br />",'l
<br />
<br />Dear Nick:
<br />
<br />~l' ~,
<br />
<br />As a result of our meeting yesterday, January 14, 1981, I
<br />have revised the cost estimate for cOQpleting the Pine Brook
<br />Water District Feasibility Study. The total figure that we agreed
<br />upon at the meeting was reduced from my original estimate of
<br />$40,483.40 to $35,995.90. Upon your receipt of this letter, we
<br />would appreciate your sending a contract to the Pine Brook Water
<br />District, using this figure and a starting date for the Study with
<br />the same date as the contract. As we agreed at the meeting, I
<br />will have the final draft ready by June 1, 1931.
<br />
<br />The breakdown of the charges is as follows. The man-hour
<br />estimate has also been revised to reflect the new figure. This
<br />revision is also attached.
<br />
<br />Principal of the Firm
<br />Project Engineer
<br />Design Engineer
<br />Draftsman
<br />2-Man Survey Party
<br />Secretary
<br />TOTAL
<br />
<br />80 hrs. @ $50.00/hr. = $ 4,000.00
<br />240 hrs. @ $3l.25/hr. = 7,500.00
<br />570 hrs. @ $28.75/hr. = 16,387.50
<br />240 hrs. @ $l6.50/hr. = 3,960.00
<br />48 hrs. @ $35.00/hr. = 1,680.00
<br />136 hrs. @ $18.l5/hr. = 2,468.40
<br /> :;;3:>,YY:>.YO
<br />
<br />Sincerely yours,
<br />
<br />GSC:pm
<br />Ene.
<br />cc: Trudie deHaas, PBWD
<br />
<br />ROCKY MOUNTAIN CONSULTANTS, INC,
<br />
<br />/~?~,._,
<br />
<br />George S. Clausen, P.E.
<br />Estes Park Branch
<br />
<br />~'.'
<br />
<br />Longmont Office: ,
<br />500 Coffman St., Suite 107
<br />Longmont, Colorado 80501
<br />(303) 772-5282 (303) 665-6283 (Metro)
<br />
<br />Denver Office:
<br />4260 East Evans Avenue, Suite 7
<br />Denver, Colorado 80222
<br />(303) 768-4532
<br />
<br />Estes Park Office:
<br />, P,O. Box 1649
<br />Estes Park, Colorado 80517
<br />(3031 586-2458 (Metro) 825-8233
<br />
|