Laserfiche WebLink
<br />. <br /> <br />APPENDIX uh.1I <br /> <br />. <br /> <br />""\,. <br /> <br />" .'f.... . 't";,'\ ""_'-'. -'_," <br />' , I. \ ~",' 1/" <br />I!"'.' .il"" ,,". ,." \' -(\., \I'~~'~ <br />~'ONSULT AN;TS"";:,,,}I~~;!:,~,,"',~:J; <br />· ',';:' '~":'~i~'i~~i~ <br />,." ,',' ; f',i-)', ;,~~ijI , <br />,', ,.rr"Q,'l~~.~..~ <br />.:,. ~:.,~~,~: ,:,~.~~:~<,:: J':;-;~'.'!~':'" ',,' . ~ ~~~~eO: <br /> <br />ROCKY <br /> <br />MOUNTAIN'~ <br />;~',>:.~;.<~\~':'~ <br /> <br />1., ':1, ,".j," <br />-e.',':i,..,~ '. "'~" ~t . <br /> <br />. " '.'~' ':." <br /> <br />January 15, 1981 <br /> <br />Mr. Nick C. Ioannides <br />Supervising Water Resource Specialist <br />COLORADO WATER CONSERVATION BOARD <br />1313 Sherman St. <br />Denver, CO 80203 <br /> <br />RE: PINE BROOK WATER DISTRICT <br />FEASIBILITY STUDY <br /> <br />".' <br />l;'.\ <br />. ..I~ ~~1~-'."~"1"" <br />,:/, 'j '1'1/.1;-.-_.....\ <br /> <br />I ,i' <br />" , <br /> <br />I ~1.11 I <br />..JVJ <br /> <br />.. <br />I' <br />,! <br /> <br />'. . ;t.. .'~ <br /> <br />I <br />L\_;;;\~:~..::~.._. ':....:; :':'.J:' <br />",II ~'" liON SOARa <br /> <br />"'i~:; <br />, .::,~f>;~ <br />. -'.~ . <br />",'l <br /> <br />Dear Nick: <br /> <br />~l' ~, <br /> <br />As a result of our meeting yesterday, January 14, 1981, I <br />have revised the cost estimate for cOQpleting the Pine Brook <br />Water District Feasibility Study. The total figure that we agreed <br />upon at the meeting was reduced from my original estimate of <br />$40,483.40 to $35,995.90. Upon your receipt of this letter, we <br />would appreciate your sending a contract to the Pine Brook Water <br />District, using this figure and a starting date for the Study with <br />the same date as the contract. As we agreed at the meeting, I <br />will have the final draft ready by June 1, 1931. <br /> <br />The breakdown of the charges is as follows. The man-hour <br />estimate has also been revised to reflect the new figure. This <br />revision is also attached. <br /> <br />Principal of the Firm <br />Project Engineer <br />Design Engineer <br />Draftsman <br />2-Man Survey Party <br />Secretary <br />TOTAL <br /> <br />80 hrs. @ $50.00/hr. = $ 4,000.00 <br />240 hrs. @ $3l.25/hr. = 7,500.00 <br />570 hrs. @ $28.75/hr. = 16,387.50 <br />240 hrs. @ $l6.50/hr. = 3,960.00 <br />48 hrs. @ $35.00/hr. = 1,680.00 <br />136 hrs. @ $18.l5/hr. = 2,468.40 <br /> :;;3:>,YY:>.YO <br /> <br />Sincerely yours, <br /> <br />GSC:pm <br />Ene. <br />cc: Trudie deHaas, PBWD <br /> <br />ROCKY MOUNTAIN CONSULTANTS, INC, <br /> <br />/~?~,._, <br /> <br />George S. Clausen, P.E. <br />Estes Park Branch <br /> <br />~'.' <br /> <br />Longmont Office: , <br />500 Coffman St., Suite 107 <br />Longmont, Colorado 80501 <br />(303) 772-5282 (303) 665-6283 (Metro) <br /> <br />Denver Office: <br />4260 East Evans Avenue, Suite 7 <br />Denver, Colorado 80222 <br />(303) 768-4532 <br /> <br />Estes Park Office: <br />, P,O. Box 1649 <br />Estes Park, Colorado 80517 <br />(3031 586-2458 (Metro) 825-8233 <br />