My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153607L Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153607L Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 10:55:52 AM
Creation date
10/5/2006 11:51:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153607L
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RECORD OF PROCEEDINGS <br /> <br />100 leaves <br /> <br />".." (,'.HO'<<'"'." ',01. <br /> <br />MARCH 9, 1993 <br />BLANCA, COWRAlXJ <br /> <br />1993 ANNUAL STOCKllOLDERS HEBTING <br /> <br />THE ANNUAL STOCKHOLDERS MEETING WAS HELD ON MARCH 9, 1993 AT THE TRINCHBRA IRR- <br />IGATION COMPANY OFFICB IN BLANCA AT 10 A.M. BOARD PRESIDENT, T~CY KESTER AP- <br />POINTED RICJ1MW TANltKA AND BYRON KUNUGZ 7'0 COUNT ELIGIBLE SlIARlIS TO DETERMINE IF <br />THE ANNUAL HJ:.'ETING COULD BE HELD. WITH It COUNT or ~ $BA1UIS RBPRES&NTBD IN PER- <br />SON AND 3523 SHARBS RBPRBSENTED BY PROXY OF THE 10,904 8LIGIBLE VOTING SBARES, IT <br />WAS DBTiiiiiiiuw THeRE WAS 1043 ELIGIBLE SHARES LACKiiiG TO F(lOVrDB FOR THB REQUIRED <br />2/3rds MAJORITY NEEDED T07iOr.v TilE ANNUAL HEBTING. THE PRESIDENT POSTPONED THE <br />MEETING FOR ONE HOUR, UNTIL 11:15 A.H., IN ORDBR TO CONTACT ELIGIBLE SHAREHOLDERS <br />TO ENCOURAGE THEIR ATTBNDANCE $0 THE ANNUAL MEETING COULD BE HELD. THE MEETING <br />RECONVENED AT 11:10 A.H. THE VOTING STOCK PRESBNT WAS RECOUNTED. SHARR IN PER- <br />SON 5206 AND BY PROXY 3883 HAKING A TOTAL OF 9089 ELIGIBLE VOTING SHARES IT WAS <br />DETBRiiiNED THB ANNUAL 'iiiiiTING COUI~D BE H8LD. - <br /> <br />THE 1993 ANNUAL STOCKHOLDER'S HEETING WAS CALLED TO ORDER WITH THB FOLLOWING DIR- <br />ECTORS PRESENT: <br /> <br />TRllCY KESTER <br />BOB SMITH <br /> <br />PRESIDENT <br />SECRETARY/TREASURER <br /> <br />GLEN WIESCAHP <br />ROBBRT ESPINOSA <br /> <br />VICE-PRESIDENT <br />DIRECTOR <br /> <br />STOCKHOLDERS PRESENT <br /> <br />RODE RT ESPINOSA <br />T/Ul.CY KESTER <br />BYRON KU/WGI <br />BOB SHITH <br /> <br />BATTLE MOUNTAIN RESOURCES <br />FORBES, INC. <br />GLEN WIESCAHP <br />LAWRENCE HARD <br /> <br />JERRY SMITH <br /> <br />AlSO PRESENT: ERNEST CHAVEZ, O.D.FLEMING, RICHARD TANAKA AND KEN KLUKSDAHL <br /> <br />MINUTES OF Tlflf..1992 ANNUAL STOCKHOLDERS MEETING WERE READ AND APPROVED AS READ IN <br />A MOTION MADE'1JBRRY SMITH, SECONDED DY DOn SMITIl AND HOTION CARRIED. <br /> <br />KEN KLUKSDAHL, REPRESENTING BATTLE MOUNTAIN RESOURCES, INC., WAS INTRODUCED TO ALL <br />TIlOSE IN ATTENDANCE. <br /> <br />PRESIDENT TRACY KESTER GAVE THE CHAIRHAN'S REPORT OF COMPANY ACTIVITIES FOR 1992. <br />THE FOLWWING ARE flIGHLIGllTS OF THA']! REPORT: <br /> <br />THB BOARD OF DIRECTORS ALLOCATED A TO'I'AL OF 20" OF WATER PER SHARE AND DELIVERED <br />AN AVE'RAGH OF 25.87" OF WATER PER SHARE; A GOOD USED 1976 GHC PICWP WAS PURCH- <br />ASED FOR TIlE DITCHRIDERS; THB ANNUAL DAM INSPECTION WAS fIELD ON JULY 1, 1992 <br />WHICH WENT WBLL, ALTHOUGH THE DAM INSPECTOR REQUIRED A WEEKLY RBPORT ON THE SEEP- <br />AGE MEASURED IN THE V-HOTCH WEIR BBWW MT. HOME RESBRVOIR AFTER A GAlIGB HEIGHT OF <br />65' WAS REACHED; A REQUEST IS BEING PREPARED FOR TilE DOWR IN REGARD TO LIFTING <br />THE RBSTIUCTION LEVEL OF 87.5' AT NT.HOMB RESBRVOIR AGAIN THIS YEAR IN ANTICA- <br />PATION OF ABOVE NORHAL RUll - OFF FRON THB HIGH WATER CONTENT SNOW PACK WE HAVE <br />THIS YEAR, COOPERATIVE WORK IS EEING DONB WITH THE iX[VISION OF WILDLIFE IN RB- <br />GARD TO OUR TWO RESERVOIRS WHERE REHAB WORK IS BEING DONE ON THB BOAT RAMPS,BA'IH- <br />ROOMS AND WIDER ACCESS ROADS AND CATTLE GUARD; THE COMPANY BUILT A NEW MEASUR- <br />ING STl?'uCTURE ON THE SANGRE/ESPINOSA, USING A RBCORPER OONATeD BY JERRY SHITH, <br />THIS WILL GIVE THE COMPAJYY HORE ACCURATE RECORDS OF INFWW INTO THB SHITH RESBR- <br />VOIR; THB FEASIBILITY STUDY ON THE STABILITY OF THB MOUNTAIN HONE RESERVOIR DAM <br />HAS BEEN COMPLETED AND TilE REPORTS VERIFY THE DAM TO DB SOUND AND COMPACTION G{)OD, <br />THE STATE REQUIRED THE COMPANY ENGINEER TO FIGURE A -NO COST ALTERNATIVE- AT TOE <br />COMPANY'S EXPENSE, THB ALTERNATIVE WOUr.D RESTRICT THE GAlIGE HEIGHT LEVIn TO 82',. <br />(THIS ALTERNATIVE HAS BBEN REJECTED) THE LAND SLIDE STUDY AT HT. HOME, WHICH <br />WOULD UTILIZE THE OLD SPILLWAY AT NT. HOME, IS LOOKING TO BE A FAVORABLE' ALTER- <br />NATIVE TO SAVE' THE COMPANY ABOUT $350,000.00 ON THE REHAB WORK IF IT CAN BE USED; <br />
The URL can be used to link to this page
Your browser does not support the video tag.