My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153607L Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153607L Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 10:55:52 AM
Creation date
10/5/2006 11:51:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153607L
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,.~:;'1>XHIBIT A <br />.," ,- <br /> <br />DEPARTMENT OF '-~~CY NAME <br /> <br />DEPARTMENT OR AGENCY NUMBE" <br /> <br />ROUTING NUMBER <br /> <br />No Encumbrance <br />TERMINATION Termina tes Con tract <br />CONTRACT No. C-153607 <br /> <br />THIS CONrRAcr, made this ,,) f( .cz:.. day of <br />use and benefit of the Department of Natural Resources <br />(Colorado Water Conservation Boardl. <br />hereinafter referred to as the State. and The Trinchera Jrrintion Comnanv <br /> <br />J A-<-7 <br />" <br /> <br />1993, by and between the State of Colorado for the <br /> <br />P.O. Box 41 <br /> <br />Blanca. Colorado 81123 <br /> <br />hereinafter referred to as the contractor/Contractor. <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a <br />surticient unencumbered balance thereof remains available for payment in Fund Number NA , Organizatioo NA <br />Appropriation NA , Program NA , Object Code NA . Contract Encumbrance Number, NA <br />and <br /> <br />WHEREAS, required approval, clearance and coordination have been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS, the State and the Contractor entered into a contract on April 14, <br />1992 (attached as Exhibit B and incorporated by reference herein), which contract <br />shall hereinafter be referred to as the "feasibility report contract," in which the State <br />agreed to pay the Contractor Nineteen Thousand Three Hundred Twenty-Five Dollars <br />($19,325) for the purpose of partially funding a feasibility report concerning the <br />rehabilitation of the Mountain Home Reservoir; and <br /> <br />WHEREAS, the feasibility report contract provided in part the following terms: <br /> <br />5, In consideration of the State assuming a portion of the cost of the <br />preparation of the said project feasibility report, the Contractor shall pay to <br />the State the sum of Twenty-Five Thousand Twenty-Six Dollars ($25,026) <br />provided that construction of the subject water project is initiated within ten <br />(10) years of the date of this contract. The Contractor shall fulfill this <br />obligation irrespective of how, or by whom, the subject water project is <br />financed or paid for so long as construction is initiated within the specified <br />time. <br /> <br />Page ~ of 2 Pages <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.