Laserfiche WebLink
<br />. <br /> <br />-EXHIBIT A <br /> <br />. <br /> <br />. <br /> <br />PROPOSAL TO PREPARE FEASIBILITY STUDY <br /> <br />Western Engineers, Inc., in accordance with instructions <br />from it's client, The Upper Yampa Water Conservancy District, <br />proposes to prepare a feasibility. report for the Yamcolo <br />Reservoir projeet in substantial conformity with the outline <br />commencing on page 12 of the Guidelines published by the <br />Colorado Water Conservation Board. Completion date for' the <br />report will be indeterminite pending action by the State <br />Board regarding partial funding of the study and the execution <br />of any necessary contracts. <br /> <br />For estimating purposes only we have listed below a <br />breakdown of estimated man hours and costs for completion of the <br />report. These estimates assume maximum utilization of data already <br />assembled in previous studies and reports. <br /> <br />Guideline Reference <br /> <br />Item 2 <br /> <br />Estimated Man Hours Rate Cost <br />4 $ 25.00 $ 100.00 <br />8 $ 15.00 $ 150.00 <br />5 $ 25.00 $ 125.00 <br />10 $ 15.00 $ 150.00 <br />20 $ 12.00 $ 240.00 <br />4 $ 30.00 $ 120.00 <br />8 $ 25.00 $ 200.00 <br />10 $ 12.00 $ 120.00 <br />5 $ 25.00 $ 125.00 <br />30 $ 15.00 $ 450.00 <br />4 $ 30.00 $ 120.00 <br />15 $ 25.00 $ 375.00 <br />30 $ 15.00 $ 450.00 <br />10 $ 30.00 $ 300.00 <br />20 $ 15.00 $ 300.00 <br />30 $ 12.00 $ 360.00 <br />20 $ 15.00 $ 300.00 <br />20 $ 30.00 $ 600.00 <br />20 $ 15.00 $ 300.00 <br />15 $ 30.00 $ 450.00 <br />20 $ 15.00 $ 300.00 <br /> <br />Item 1 <br /> <br />Item 3 <br /> <br />Item 4 <br /> <br />Item 5 <br /> <br />Item 6 <br /> <br />Item 7 <br /> <br />Item 8 <br /> <br />Item 9 <br /> <br />TOTAL SALARY COST ---------------------------------- $ 5,635.00 <br />EXPENSES (Travel, Meals, printing, etc~) ----------- $1,000.00 <br />$ 6,635.00 <br />Say ------- $ 6,600.00 <br /> <br />- 1 - <br />