My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00350
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:42 AM
Creation date
10/5/2006 11:50:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153574
Contractor Name
Longmont, City of
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />....1, .t~()'''i.....,..''H,~i~jl <br />'WPB <br /> <br />- .~ ,. <br /> <br />f,i':; <br />- <br /> <br />.XHIBIT B <br /> <br />UEl'^Rr~J. OR AGJ:NCY .....UMBl:. <br />..... 34-04-00 <br />CONTkACT ROllTINl; NltMBf.M. <br />\?-' J-,":':; <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />$4.975 <br /> <br />THIS CONTRACT. madr Ihi~='~........-I..o.Y of r r~/t ~ <br /> <br />Slale of Colorado fot Ihe u~(' and beneftl uf tile lkp3flmenl of'l Natural <br />fr.o)or~no Water Conservation Board). <br /> <br />he~inafler tl"lt"JTCd 10 .~ the Slale. and "2 the Ci tv of Lonamont, <br />1100 So. Sherman St.. Lonarnont. CO B0501, <br /> <br />herdnaher tdcfJ"cd to It~ llle conlraelur IContractor. <br /> <br />198 2. . h... and bel ween Ihe <br />Resources <br /> <br />WHEREAS. IlIlhorily clI"islS in Ihe Law llnd Fllnd~ haY(' been blldlleled. approprialed ,nd olherwi~e made <br />""llill1hlc :md a !'iurricienl unencumbered hal:mcc lhcreur remuins Z1v~illhh: for payment in Fund Number 4 008 <br />G/L ACCf,unl Nurnher~, Cuntract EnClUllbrnncc NllmtJerl/.'::'" J.f1....,"'"1'. :nd <br />ABL Account Number 12910, Org. Unit 77-77-777, <br /> <br />WHEREAS. requited aJ1J1w,'''1. clearance uod cHllrdinaliltn ha~ been accomplished horn and wilh llPllropriale <br />8Aeneie1; and <br /> <br />WHEREAS. pursuant to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as amended. the State is authorized <br />to construct certain water projects for the benefit of the <br />people of the State of Colorado; and <br /> <br />WHEREAS. the City of Longmont has made application to the <br />State for the improvement of its existing facility. such <br />improvement of the facility is hereinafter sometimes referred <br />to as the project; and <br /> <br />WHEREAS. the Contractor is a City within the State of <br />Colorado; <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. The Cont~actor shall have a feasibility report prepared <br />and directed to the problem of improving the facilities of <br />McCall Lake. northwest of Longmont. Colorado. in accordance <br />with a proposal for a project feasibility report prepared by <br />the consulting engineering firm of Rocky Mountain Consultants. <br />Inc. (the Consultant). and approved by the State. dated <br />September 24. 19B7. which proposal is attached hereto as <br />Exhibit A and made a part of this contract. <br /> <br />2. Ten (10) copies of the final report called for in this <br />contract shall be furnished to the State not later than sixty <br />(60) days after the date of the contract. unless such time is <br />extended by mutual agreement of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor. the <br />State shall pay ~o the Contractor the sum of Four Thousand Nine <br />Hundred Seventy-five Dollars ($4.975) in the manner fol~owing: <br /> <br />a. Sixty percent (60\). to wit. Two Tho~sand Nine Hundred <br />Eighty-Five Dollars ($2.985) of the total amount due in two <br />(2) monthly installments of Fourteen Hundred Ninety-Two <br />Dollars'and Fifty Cents ($1.492.50) eBCn. commencing twenty <br />(20) days after the date of this contract. <br /> <br />b. The remaining forty percent (40\). to wit. Nineteen <br />Hundred NinetY Dollars ($1.990) within forty (40) days <br />following receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />c. The total cost of services to be rendered for the <br />Contractor by the Consultant is Nine Thousand Nine Hundred <br />tifty Dollars ($9.950) and the Contractor shall pay the sum of <br />Four Thousand Nine Hundred Seventy-Five Dollars ($~.975) as <br />agreed to by.letter dated September 24. 19B7. which is hereby <br />~tt8ched and made a part of this contract as Exhibit B; and in <br />mo event shall this payment be the liability of the State of <br />Colorado. EXHIBIT B <br />(Project Contract) <br /> <br />~e I oL_.i...rl!!es <br />.(.Wt tOSlItI~'li"n~ un 1l'~e,!IC ur IUI "'i!t.l <br /> <br />.3'95--5)001-10'14 <br /> <br />4~94E <br /> <br /> <br />..".. <br />
The URL can be used to link to this page
Your browser does not support the video tag.