My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00350
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:42 AM
Creation date
10/5/2006 11:50:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153574
Contractor Name
Longmont, City of
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. . <br /> <br />o/:~ <br />~ <br /> <br />'~ <br />u <br /> <br />.~ <br /> <br />shall be postponed for the same number of months as the <br />Contractor delays in drawing funds. Said installment payments <br />shall be made payable to the Colorado Water Conservation Board, <br />payable at the offices of said Board in Denver, Colorado. <br /> <br />D. The state agrees that it shall: <br /> <br />1. Loan to the Contractor for the construction of the <br />project an amount not to exceed Two Hundred Fourteen Thousand <br />Four Hundred Fifty-Three Dollars and Sixty-Six Cents <br />($214,453.66). said Two Hundred Fourteen Thousand Four Hundred <br />Fifty-Three Dollars and Sixty-Six Cents ($214,453.66) shall be <br />made available to the Contractor in accordance with the following <br />terms and conditions: <br /> <br />a. Commencing ten (10) days from the date of this <br />contract and for every month thereafter until said <br />project has been completed, the Contractor shall <br />prepare, with the assistance of the Consultant referred <br />to in paragraph B.1. above, an estimate of the funds <br />required for project construction during that month and <br />shall forward said estimate to the state not less than <br />fifteen (15) days prior to the beginning of such month. <br /> <br />b. Upon receipt and approval by the State of such <br />monthly estimate, the State will, within forty (40) <br />days from the receipt of such estimate, pay over to the <br />Contractor the amount of the monthly estimate or such <br />portion thereof as has been approved by the state. <br /> <br />c. No payments will be made under this contract unless <br />and until the project plans and specifications referred <br />to in paragraph B.l. above are approved by the State in <br />writing. <br /> <br />d. Project construction costs eligible for payment by <br />the State shall be limited to the cost of: <br /> <br />(1) Preparing final designs and specifications for <br />the project. <br /> <br />(2) Preparing bid and construction contract <br />documents. <br /> <br />(3) Preparing environmental assessment or <br />environmental impact statements, and otherwise <br />complying with the federal National Environmental <br />POlicy Act. <br /> <br />(4) Complying with all federal, State, and local <br />regulatory requirements, including the obtaining of <br />all required permits. <br /> <br />(5) Land and water rights acquisitions needed for <br />the project, including the necessary appraisals and <br />evaluations. <br /> <br />(6) Fish and wildlife mitigation measures required <br />by federal, state, or local laws and regulations. <br /> <br />(7) Actual construction as called for in the bid <br />documents and in Change Orders approved by the <br />Consultant, the Contractor, the Construction Firm, <br />and the State. <br /> <br />(8) Engineering services for construction <br />management, including design and construction <br />management for State-approved Change Orders. <br /> <br />(9) Legal services for: <br /> <br />~~~ <br /> <br />2 pages <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.