My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00347
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:20 AM
Creation date
10/5/2006 11:50:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153590
Contractor Name
Colorado River Water Conservation District
Contract Type
MOU
Water District
0
County
Delta
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l, <br /> <br />1 <br /> <br />. <br /> <br />. <br /> <br />ENGINEERING SERVICES <br />CONTRACf <br /> <br />~r <br />THIS CONTRACT is made, as of the 11:' day of January, 1992, by and <br />between the Colorado River Water Conservation District (the "District") and <br />Hydrosphere Resource Consultants, Inc. (the "Contractor"). <br /> <br />WHEREAS, the District is identified as the contracting entity for <br />development of the Plannning Model described in United States Department of <br />the Interior, Bureau of Reclamation, Memorandum of Understanding No. I-FC- <br />40-10870 for the Gunnison River Basin Water Management and Planning Study <br />(Gunnison MOU), a copy of which is attached hereto as Attachment "1"; and <br /> <br />WHEREAS, the District will consult with and seek approvals, as set forth <br />in this contract, from the Sponsors Committee, consisting of representatives <br />from each Sponsoring Agency identified in the Gunnison MOU during the <br />execution of this contract and the development of the plannning model; and <br /> <br />WHEREAS, the Sponsors Committee has selected and agreed to the <br />selection of a contractor through an open competitive selection process to <br />develop the planning model; and <br /> <br />WHEREAS, the District intends to contract for engineering services, and <br />the Contractor wishes to provide such engineering services as described in the <br />attached document entitled "Scope of Services" (identified as Attachment "2" <br />hereto); and <br /> <br />WHEREAS, the Contractor represents that it is a professional engineering <br />firm that has the experience and expertise required to carry out the study in a <br />satisfactory and timely manner; and <br /> <br />WHEREAS, this Contract is made and will be performed in the State of <br />Colorado. <br /> <br />NOW, THEREFORE, it is hereby agreed that: <br /> <br />1. Services bv the Contractor. The Contractor shall, in consideration of the <br />compensation to be paid to it by the District, pursuant to Paragraph 2 below, <br />complete the work tasks and provide the products specified in Attachment "2", <br />Scope of Services, attached hereto and incorporated hereby by this reference. <br />The work shall be completed by April 30, 1993. All interim and final products <br />
The URL can be used to link to this page
Your browser does not support the video tag.