My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
10/5/2006 11:50:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br /> <br />BOIrILE <br /> <br />RECEIVED <br />\'\AR 3 0 2001 <br /> <br />165 South Union Blvd., Suite 200 <br />Lakewood, CO 80228 <br />TEL: (303)987'3443 <br />FAX: (303)987-3908 <br />www.boyleengineering.com <br /> <br />Cle\OIidO Water COl\SeNaUon Board <br /> <br />Mr. Bill Green, P,E. <br />COLORADO WATER CONSERV A nON BOARD <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />March 23, 2001 <br /> <br />CWCB Monument Lake Dam Feasibilitv Study <br /> <br />On behave of the Town of Monument (Town), Boyle Engineering Corporation (Boyle) is <br />pleased to submit the three enclosed copies of the final Monument Lake Dam Feasibility Study, <br />The study examines the feasibility of non-structural and structural alternatives to rehabilitate the <br />area comprising of Monument Lake Dam and Reservoir; and demonstrates the technical, <br />financial, environmental, and institutional feasibility of the alternatives, <br /> <br />The study has been prepared in conformance with requirements for funding of the Colorado <br />Water Conservation Board (CWCB) and the dam safety regulations of the Colorado State <br />Engineer's Office (SEO), <br /> <br /> <br />tion <br /> <br />Ed A. Toms, P,E, <br />Managing Engineer <br /> <br />Enclosure: CWCB Report <br /> <br />Copies to: Mr. Riek Sonnenburg - Town of Monument <br />Mr, Roger Sams - GMS Ine, <br />Mr. Bob Krassa - Krassa, Maden & Miller, LLC <br /> <br />/EAT/CWCS TRANS LTR <br /> <br />BOYLE ENGINEERING CORPORATION <br /> <br />ePecycledPa.per <br />
The URL can be used to link to this page
Your browser does not support the video tag.