My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
10/5/2006 11:50:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />....' .,..... <br /> <br />" <br /> <br />the Board authorizefue staff to enter into the stipulation, and that it recognizes <br />the impact to its instream flow right as de minimis based on the information <br />provided. The motion was seconded by Keith Catlin and approved unanimously <br />(8-0). <br /> <br />18. Native Species Conservation Trust Fund Recommendation <br />Tape 3: Start/Stop: 3540 - 3600 <br />Action: A motion was made by David Smith to accept the staff recommendation to <br />authorize the amended amount of$2,016,000 from the Native Species <br />Conservation Trust Fund for expenditure on the programs listed in the attached <br />Board memo, The motion was seconded by Bob Burr and approved unanimously <br />(7-0), <br /> <br />19a. Rio Grande Basin Issues - Rio Grande Director's Report <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken <br /> <br />3611 - 3700 <br /> <br />19b. Silvery Minnow <br />Tape 3: Start/Stop: 3743 - 4016 <br />Action: A motion was made by Eric Wilkinson to adopt the resolution as proposed, The <br />motion was seconded by Eric Kuhn and approved unanimously (8-0), <br /> <br />19c. Summitville Settlement <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken, <br /> <br />4055 - 4564 <br /> <br />20a. Platte River Basin Issues - Denver Director's Report <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken, <br /> <br />4681 - 5069 <br /> <br />20b. Platte River Basin Issues - North Platte Director's Report <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken, <br /> <br />5080 - 5172 <br /> <br />20c. Platte River Basin Issues - South Platte Director's Report <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken, <br /> <br />5184 - 5530 <br /> <br />2011. Status Report on Platte River Endangered Species Cooperative Agreement <br />Tape 3: Start/Stop: 5545 _ 5990 <br />Action: Information item; no action taken, <br /> <br />21 a. Arkansas River Basin Issues - Arkansas Director's Report <br />Tape 3: Start/Stop: <br />Action: Information item; no action taken, <br /> <br />6003 - 6140 <br /> <br />Minutes January 24-25, 2001 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.