Laserfiche WebLink
<br />l <br />, <br /> <br />Action: <br /> <br />A Inotionwasmade by Enc KUluI. to accept the staff reCommendation for approval <br />of this non-reimbursable project expenditure, and include revised language as <br />discussed to be more explicit in explaining CWCB's involvement in the project. <br />The motion was seconded David Smith and approved unanimously (10-0), <br /> <br />:I <br />-:.- <br /> <br />14a. Water Supply Planning and Finance - Referred Non-Reimbursable Investments - Colorado <br />Institute oflrrigation Management (Colorado State University) - Dual Water <br />System Study <br />Tape 2: Start/Stop: 5275 - 7047 <br />Tape 3: Start/Stop: 000 I - 0068 , <br />Action: A motion was made by Eric Kuhn to accept the staff recommendation that CWCB <br />fund portions of the project and portions of the feasibility study, The motion was <br />seconded by Patricia Wells and approved (7-3), <br /> <br />14b. Water Supply Planning and Finance - Referred Non-Reimbursable Investments - Power <br />Conversion Coefficient (pCe) Study <br />Tape 3: Start/Stop: 0074 - 0262 <br />Action: A motion was made by Patricia Wells to accept the staff recommendation to <br />approve this non-reimbursable project expenditure of an additional $50,000, and to <br />seek authority in the 2001 Construction Fun Bill for the 2nd phase of this <br />Cooperative Study, The motion was seconded by Don Schwindt and approved <br />unanimously (9-0) <br /> <br />ISa. Referred Non-Reimbursable Investments - CWCB - Floodplain Mapping Program <br />Tape 3: Start/Stop: IllS - 1215 i" <br />Action: A motion was made by Eric Kuhn to approve the staff recommendation to <br />authorize $250,000 from the Construction Fund to be appropriated to the <br />Department of Natural Resources for floodplain mapping for Gunnison County, <br />Delta County, the Town of Basalt, Eagle County, the town of Gypsum and Weld <br />county, The motion was seconded by Patricia Wells and approved unanimously <br />(9-0). <br /> <br />ISb. Referred Non-Reimbursable Investments - ewCB - Cherry Creek Reservoir Flood Safety <br />Study <br />Tape 3: Start/Stop: 1215- 1280 <br />Action: A motion was made by Eric Kuhn to accept the staff recommendation to authorize <br />up to $75,000 for allocation to the CWCB for the performance of a Probable <br />Maximum Flood (pMF') analysis for the Cherry Creek Reservoir Flood Safety <br />Study, The motion was seconded by Don Schwindt and approved unanimously (9- <br />~ . <br /> <br />ISc. Referred Non-Reimbursable Investments - Alamosa/LaJara Water Conservancy District- <br />Alamosa River Restoration Project <br />Tape 3: Start/Stop: 1280 - 1290 <br />Action: A motion was made by Don Schwindt to accept the staff recommendation to <br />authorize $150,000 for allocation to the Alamosa-La Jara Water Conservancy <br />District or the Alamosa River Watershed Restoration Foundation for river <br /> <br />Minutes January 24-25, 2001 <br />Page 6 <br />