My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00345
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:20 AM
Creation date
10/5/2006 11:50:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153330
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
0
County
Routt
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />INTERNATIONAL ENGINEERING COMPANY, INC. <br /> <br />Mr. Nick Ioannides <br /> <br />-2- <br /> <br />September 11, 1978 <br /> <br />As these documents were in preliminary form, it is recognized that some of <br />the recommendations made in this review may already have been adopted. To <br />expedite the overall review process, our comments in draft form were forwarded <br />to Mr. Ed Currier of Western Engineers and to Mr. John Fetcher of the Upper <br />Yampa Water Conservancy District, as well as to you. In addition, brief <br />conferences were held with representatives of Western Engineers before, <br />during, and after the site inspection, <br /> <br />The format of this report follows that of the scope of services included in <br />the contract. Phase I consists of Dr. Robinson's geologic report and engin- <br />eering conclusions which we have drawn from it. Phase II consists of our <br />evaluation of the dam design and specifications with emphasis upon long-term <br />stability of the abutments, foundation, and shoreline. Phase III summarizes <br />construction-related provisions of the contract documents where we feel <br />modifications would facilitate both bidding and construction. The objective <br />here is reduced cost and time requirements without sacrificing quality, <br /> <br />To facilitate review of this report, the appendix includes plan and section <br />views of the dam (Figures 1 and 2) and a sketch of proposed modifications <br />(Figure 3). Foundation permeability and seepage calculations are also <br />i nc 1 uded. <br /> <br />We appreciate the opportunity to work with all parties concerned. Please <br />let me know if we can be of further assistance, <br /> <br />Very truly yours, <br /> <br />c!l~j:~ <br /> <br />Project Engineer <br /> <br />JLJ:ew <br />enc 1 osure's <br /> <br /> <br />A <br />MORRISON <br />KNUDSEN <br />COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.