My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00344
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:20 AM
Creation date
10/5/2006 11:50:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153424
Contractor Name
Colorado River Water Conservation District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />'. <br /> <br />(5) west Mamm Creek Dam and Reservoir, with a storpge <br />capacity of aboot 6,500 acre-feet, <br /> <br />(6) East Divide Creek Darn and Reservoir, the maximum <br />storage capacity of which and site for which will <br />be selected during the study, <br /> <br />(7) Canals, laterals, pumping stations, and/or <br />pieplines associated with the reservoirs in (4), <br />(5), and (6) abOve, <br /> <br />(8) Beaver Creek Da~ and Reservoir, with a storage <br />capacity of about 5,000 acre-feet, <br /> <br />(9) Yank Creek Dam and Reservoir, with a storage <br />capacity of about 9,000 acre-feet, <br /> <br />(10) Raystack Darn ana Reservoir, with a storage <br />capacity of about 7,500 acre-feet, and <br /> <br />(11) Canals, laterals, and/or pipelines associated with <br />reservoirs in (9), (9), and (10) above. <br /> <br />A range of reasonable assumptions shall be made about the <br />future status of conditional dscrees which are senior to the <br />storage decree held for the reservoirs. In turn, appropriate <br />analyses of alternative reservoir operations shall be performed <br />to reflect such a range of assumptions. The effects of such <br />alternative assumptions on the yield of reservoirs shall he <br />analyzed. <br /> <br />The study shall not include evaluations of financial <br />feasibility, economic justification (i.e.. a cost-benefit <br />analysis), or the recreational, environmental, social, or <br />cultural impacts of the project, be they beneficial or adverse. <br /> <br />The Consultant obtained shall make every possible use of <br />existing data and information before performing any original data <br />collection, analyses, or field work. Field work (general site <br />inspections, soils sampling and testing, geologic investigations, <br />etc.), if required at all, shall be minimized. <br /> <br />Funding and Scheduling <br /> <br />The cost of the study shall be negotiated between the <br />Contractor and the Consultant, subject to the approval of the <br />CWCS, but shall not exceed SlOO.OOO. All personnel, operating, <br />overhead, and travel costs of the Consultant must be within the <br />negotiated amount. <br /> <br />The Consultant selected must be able to initiate work <br />immediately upon the execution and final approval of a contract <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.