Laserfiche WebLink
<br />.. <br /> <br />re <br />) <br />ICLARK' THOMASI ~gl~ee'lltlg ~tlC. <br /> <br />..;:.-".,_.,._---,._-----~"--". <br /> <br />i.. ') <br /> <br />432 NORTH BROADWAY '\ <br /> <br />CORTEZ. COlORA.DO 81321 <br /> <br />PHONE- 303.565.7805 <br /> <br />PLAN OF DEVELOPM:>NT <br /> <br />6. (a) Phvsi~-<ll plan <br />Describe' physical plan both ,~xisting and proposed: <br />(2)M& I water treatment and distribution system for the <br />present and proposed distr:lct. <br /> <br />(S)Water Quality control. <br />Describe present \Jater intake & proposed intake <br />structure - describe \Jatorshed management. <br /> <br />(b) Geolooic Investi~ation <br />Proposed rav \Jater storage s~te and treated \Jater <br />storage tank could be site for investigation. <br /> <br />(c) Desif7n <br />(l)Sizing criteria - discussion of design criteria to <br />be used in sizine the intake, ra\J water storage tank, <br />rav \Jater pipeline, treatment plant, treated water <br />storage tank and distribution lines. <br /> <br />(d) Structure Plans <br />Describe st'ructures to be inc:orporated into proposed <br />project. Describe the linkae:e of these ne\J structures <br />with existing facilities and the proposed operation of <br />these structures. Discussion will include grades, <br />'dimensions, hydraulic propert.ies, pipe classes, and <br />typical sections. <br /> <br />(f) Sedimentation <br />Discuss the incorporation of treatment of sediment removal <br />facilities in the raw \Jater storage reservoIr and the <br />routine of periodic sediment renoval. Detail of proposed <br />clarification in the ra\J water storage reservoir. <br /> <br />(g) Rif7hts-of-way <br />Description of additional riBhts-of-way needed at intake <br />site. <br /> <br />Principel time - 146 hrs. @ $20.00jhr. <br />ASSOciates time - 36 hrs. @ $20.00jhr. <br />Drafting time - 54 hrs.@ $l5.COjhr. <br /> <br />Total: <br /> <br />$ 2,920.00 <br />720.00 <br />810.00 <br /> <br />$ 4,450.00 <br /> <br />> <br />~ <br />