Laserfiche WebLink
' <br />, <br />, <br />, <br />' <br />' <br />, <br />' <br />, <br />Water Ri¢hts <br />SummiPs decreed water rights are listed below. <br />Name No. Adiudication Date <br />Turkey Creek Ditch 18 1892 <br />83 1963 <br />101 1968 <br />Lost Canyon Ditch <br />Summit Reservoir <br />Puett Reservoir <br />Joe Moore Reservoir <br />84 1963 <br />55 1933 <br />96 1963 <br />54 1933 <br />55 1933 <br />59 1933 <br />Amount <br />30 cfs <br />60 cfs <br />40 cfs <br />135 cfs <br />3013 AF <br />1274 AF <br />654 AF <br />1666 AF <br />459 AF <br />The value of the water rights has not been recently estimated. The amount of $75,000 shown in <br />Appendix C has not been adjusted for current mazket conditions. <br />T6e Selected Proiect <br />, The description of the presently identified system repairs/improvements and the design <br />considerations aze described below for each proposed repair. The repairs/improvements listed <br />herein aze expected to be completed over about the next 7 years; however, Summit may request <br />� modifications or additions to the items below to best meet the needs of the system. If any <br />changes to the items below aze requested, Summit will provide technical information and designs <br />for CWCB review as part of the process to obtain funds for the particulaz item. <br />, <br />' <br />� <br />, <br />� <br />, <br />' <br />' <br />The repairs/improvements aze not listed in the order of expected priority; however, the Summit <br />Dam outlet lining is the highest priority and will be completed before this loan application is <br />approved. The number for each item is keyed to the Project Map. <br />l. Turkey Creek Diversion - The Turkey Creek diversion structure diverts all of the water in <br />Lost Canyon into the Turkey Creek Ditch, during high spring flows that exceed the capacity of <br />the ditch, causing overtopping of the ditch banks because the ditch is not lazge enough to cany <br />the water diverted. In order to alleviate the overtopping, a wasteway on the ditch to convey <br />excess water back to Lost Canyon Creek in conjunction with a control gate at the diversion and <br />other improvements to better divert the water are recommended. The wasteway structure would <br />be a steel or concrete inlet box with a pipe to carry the excess water back to the drainage. <br />3 <br />