My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153770 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153770 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:34:54 PM
Creation date
10/5/2006 11:50:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153770
Contractor Name
Summit Reservoir and Irrigation Company
Contract Type
Loan
Water District
32
County
Montezuma
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Summit Reservoir and Irrigation Company <br />Stanley McCabe <br />President <br />Mike Jones <br />Vice President <br />Norman Butler, Jr. <br />Boazd Member <br />David Sanford <br />Secretary-Treasurer (not an elected position) <br />Steve Boyd <br />Ditch Rider <br />Engineer: <br />Steven C Harris, P.E. <br />Harris Water Engineering, Inc. <br />Durango, Colorado 81301 <br />970-259-5322 <br />Acknowledgment of those who assisted in the preparatiou of this report: <br />David Y. Sanjord <br />Secretary-Treasurer <br />Summit Reservoir and Irrigation Company <br />John Yan Sciver, P.E. <br />Colorado Water Conservation Board <br />Steven CHarris, P.E. <br />Harris Water Engineering, Inc. <br />Colorado Professional Engineer Registration No. 14,303 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.