My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153770 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153770 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:34:54 PM
Creation date
10/5/2006 11:50:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153770
Contractor Name
Summit Reservoir and Irrigation Company
Contract Type
Loan
Water District
32
County
Montezuma
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />, Institutional Considerations <br />Summit has applied to the CWCB to borrow up to $600,000. The loan from the CWCB is <br />' contingent upon CWCB and Legislative approval, and the successful negotiation of a contract <br />between the CWCB and Summit. <br />' Each year Summit obtains the authority from the shazeholders, at the annual meeting, to conduct <br />all of the necessary business of the Company for the coming yeaz, the Boazd has obtained loans <br />from the CWCB and other entities in the past based on this general authority. The meeting in <br />' 1997 will be January 25, at which time the Boazd will propose the same authority with a specific <br />clause authorizing the CWCB loan. <br />' Opinion of Feasibilitv <br />The selected facility plans aze technically and financially feasible. There aze no significant <br />, roadblocks which would keep Summit from successfully completing this project. <br />1 <br />' <br />, <br />' <br />' <br />' <br />' <br />' <br />, <br />' <br />� <br />' <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.