My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00338
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:46 AM
Creation date
10/5/2006 11:50:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153749
Contractor Name
DeWeese-Dye Ditch and Reservoir Company
Contract Type
Loan
Water District
12
County
Custer
Bill Number
FSL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />...~ . - ~ <br /> <br />. <br /> <br />STA~F COLORADO <br /> <br />o <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 Stale Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 8664474 <br /> <br />Roy Romer <br />Govemor <br /> <br />February 27, 1996 <br /> <br />Je.mes $_ Lochhead <br />Execmive Dim:t:or. DNR <br />Dartes C. lile. P.E. <br />DirectOr. CWCB <br /> <br />Mr. Clifford Reid <br />Deweese-Dye Ditch and Reservoir Company <br />1714 Poplar <br />Canon City, CO 81212 <br /> <br />RE: Small Dam Site Planning Funds <br /> <br />Dear Mr. Reid: <br /> <br />Enclosed is a purchase order in the amount of $5,000.00 issued to the DeWeese-Dye Ditch <br />and Reservoir Company under the Colorado Water Conservation Board's Small Dam Site <br />Reconnaissance Program. The purchase order is for engineering services to be provided to <br />the Company by GEl Consultants, Inc. per the "Proposal for Engineering Services for Field <br />Investigations at DeWeese Dam, near Westcliff, Colorado" dated December 22, 1995. Under <br />the guidelines established for the CWCB Small Dam Site Reconnaissance Program, you may <br />invoice us for one half of the cost of the study up to the amount of the purchase order. <br /> <br />When the study is completed, please ask your consultant to send us a copy of the draft report <br />so that we may review it and advise you of any comments we may have. Upon review and <br />acceptance of the report by the Company and the CWCB staff, please send us an invoice on <br />Company letterhead referencing our purchase order number and the work which was done by <br />GEl along with copies of the consultant's invoices and the final study report. These items <br />may be sent to my attention. <br /> <br />It is my understanding that, after completion of these field investigations, the Company may <br />want to have a feasibility study prepared to investigate various repair options for DeWeese <br />Dam. If the Company is considering initiating design and construction for the repair work in <br />1997, the feasibility study must be submitted to the CWCB staff no later than August 3 L <br />1996 in order to be considered for a Construction Fund loan in 1997. It is also important that <br />the feasibility study be prepared in accordance with the Guidelines for Financial Assistance <br />through the Colorado Water Conservation Board Construction Fund, a copy of which is <br />enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.