My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00337
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:19 AM
Creation date
10/5/2006 11:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153032
Contractor Name
Hotchkiss, Town of
Contract Type
Grant
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and maintenance of the turbine and safety features required for successful <br />installation would not be economically feasible at the present five year <br />average of "avoided costs" as prescribed by the Public Utilities Commission <br />of 17.4 mills per KWH. <br /> <br />A by-pass would be installed around the turbine to relieve excess head <br />and water in order that the turbine would only receive sufficient head and <br />water to generate 15 Kw. The by-pass would also be used during periods of <br />maintenance or repair of the turbine. The potential generating capacity of <br />15 Kw, which is lost through the by-pass, is only potential generating <br />capacity that would be lost during times of peak flows. During periods of <br />normal flow there would be no flow of water through the by-pass. <br /> <br />Using Energy Impact Funds the Town of Hotchkiss installed 2,900 lineal <br />feet of 8" pipe from point A to point B as shown on Exhibit B, the line has <br />a total carryi.ng capacity of 3,000 GPM (6.7 cfs). <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.