My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00337
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:19 AM
Creation date
10/5/2006 11:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153032
Contractor Name
Hotchkiss, Town of
Contract Type
Grant
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Item <br /> <br />Item <br /> <br />. <br /> <br />. <br /> <br />TREATED WATER TRANSMISSION LINE - SEGMENT ONE <br /> <br />Description <br /> <br />Quantity <br /> <br />1. <br /> <br />lO" transmi.ssion line <br /> <br />4,000 <br /> <br />2. <br /> <br />Connection to existing <br />piping at location A <br /> <br />3. <br /> <br />Connection to existing system <br />at point B <br /> <br />4. <br /> <br />Connection to Hanson and <br />Powell Mesa Pipe Line <br /> <br />SUBTOTAL <br /> <br />Unit <br /> <br />Unit Cost <br /> <br />Feet $ <br /> <br />10.25 <br /> <br />1 <br /> <br />L.S. $ 1,500.00 <br /> <br />1 <br /> <br />L.S. $ 1,000.00 <br /> <br />1 <br /> <br />L.S. $ <br /> <br />850.00 <br /> <br />Plus 25% for Legal, Engineering, Administration, and <br />Contingencies <br /> <br />Estimated Project Cost for Treated Water Flow Line <br /> <br />HYDROELECTRIC POWER GENERATION <br /> <br />Description <br /> <br />Quanti ty Unit <br /> <br />Unit Cost <br /> <br />1. <br /> <br />15 Kw Hydroelectric <br />generating unit <br /> <br />2. <br /> <br />Pressure relief valve and <br />by-pass piping <br /> <br />3. <br /> <br />Turbine and Equipment building <br /> <br />4. <br /> <br />1,500 <br /> <br />Buried Power Cable <br /> <br />5. <br /> <br />Braker Panel and Metering <br />Package <br /> <br />SUBTOTAL <br /> <br />1 <br /> <br />Each <br /> <br />$ 9,120.00 <br /> <br />1 <br /> <br />Each <br /> <br />$ 6,100.00 <br /> <br />1 <br /> <br />Each <br /> <br />$ 1,000.00 <br /> <br />Feet <br /> <br />$ <br /> <br />4.00 <br /> <br />1 <br /> <br />Each <br /> <br />$ 6,000.00 <br /> <br />Plus 25% for Legal, Engineering. Administration, and <br />Contingencies <br /> <br />Total Cost <br /> <br />$ 41,000.00 <br /> <br />$ 1,500.00 <br /> <br />$ 1,000.00 <br /> <br />$ <br /> <br />850.00 <br /> <br />$ 44,350.00 <br /> <br />$ 11,087.50 <br /> <br />$ 55,437.50 <br /> <br />Total Cost <br /> <br />$ 9,120.00 <br /> <br />$ 6,100.00 <br /> <br />$ 1,000.00 <br /> <br />$ 6,000.00 <br /> <br />$ 6,000.00 <br />$ 28,220.00 <br /> <br />$ 7,055.00 <br /> <br />Estimated Project Cost for Hydroelectric Power Generation $ 35,275.00 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.