My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00336
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:19 AM
Creation date
10/5/2006 11:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.,.. <br /> <br />~~ 6-AC-02A (R ~I8S) <br />'NOPB <br />Towaoc <br />Pipeline <br /> <br />~' ItO;J-o <br />DF.PARTM_. . OR AGENCV NUMBER <br />34-04-00 <br />CONTRACT ROUTING NUMBER <br /> <br />" <br /> <br />LAND ACQUISITION <br />CONTRACT <br /> <br />THIS CONTRACT. made thjs-2.t)"~~ay of ~.J".tf 1982-. by and between the <br />State of Colorado for the use and benefit of the Depart nt of '1 N~r.llr~' Rp-S01]rce~ <br />(Colorado Water Conservation Board) <br />hereinafter refel1'ed to as the Slate, and '.2~ Morrison-Knudsen - Enqineers I Inc. I <br />H20 Lincoln St., Suite 1200, Denver, CO 80203, <br />hereinafter referred to as the contractor/Contractor. . <br /> <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a SlJ(ficient unencllmbered balanc~ thereof remains ava'ble for payment in Fund Number 4008 <br />G/L Account Number t;l??X, Contrael Encllmbrance NumberCZ .<3t;Jn. and ' <br />ABL AccQunt NO. ~, Org. Unit 77-77-777, <br />WHEREAS, re~uir~d apprt)~al. clearance and coordination has been accomplished from and with approp~ia'te <br />agi-ncies: and <br /> <br />WHeREAS, the State has entered into the Colorado Ute Indian <br />Hater Rights Final Settlement Agreement of Deeember 10, 1986' <br />(the "Agreement"), with the United States, the Ute Mountain Ute <br />Indian Tribe (the "Tribe"), and others, which Agreement <br />requires, inter alia, the State to construc~ a pipeline for the <br />transportation of water from the water treatment plant of the <br />city of Cortez, Colorado, to the Town of Towaoeon the Trib~'s <br />reservation in Colorado (the IIproject II) by December. 1988; and <br /> <br />WHEREAS. the Colorado Hater Conservation Board (tl)e "CHCB") <br />has been authorized by section 1 of chapter 230, session Laws <br />of Colorado 1986. to construct the Project in fulfillment ot <br />the Agreement; and <br /> <br />WHEREAS. the State is responsible for acquiring the lanQs <br />and interests therein (the "project lands") between the Cortez <br />water treatment plant and the boundary of the Tribe's <br />reservation which are needed for the Project; and <br /> <br />HHEREAS, the State desires to obtain by contract the <br />services needed to identify. appraise, negotiate for, and <br />,aequire. and perform all other tasks necessary to obtain. the <br />project lands; and ' <br /> <br />WHEREAS. every effort has been made by the State to prOCeed <br />with the Project as expeditiously as possible so that there <br />would be time to obtain these services through eompetitive <br />contracting procedures; end <br /> <br />,WHEREAS, changes in the Project's design asked for by the <br />Tribe. unantieipated complications in the selection of the <br />routing for the Project due to conflicts with the location of <br />existing utilities and PUblic rights-of-way. and the <br />unanticipated need to obtain easements across private lands, <br />for which the CWCB has hed to obtain legiSlative authority <br />during the 1988 session ~f the Colorado General Assembly have <br />caused substantial delay~ in the work on the Project; and <br /> <br />wHEREAS, the December. 1988. deadline for the Project's <br />completion cannot be met if competitive contracting procedures <br />where required are now followed to obtain the desired servic'es; <br />and <br /> <br />WHEREAS. 'failure to <:omplete the Project on time will <br />jeopardize the health, w~lfare, and safety of the Tribe. which <br />do~s not have a potable ~ater supply on the reservation and <br />must haUl water daily by truck; and <br /> <br />5491E <br /> <br />3955:HJ1-1014 <br /> <br />Pag(! J of..!.Q.. pages <br />. ~(Sec insrrut"tiuns ,on. reverse of last page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.