My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00336
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:19 AM
Creation date
10/5/2006 11:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_~ Foml 6-AC-02A fR .5J8S1 <br />NOPB <br />..j Towaoc <br /> <br />Dl~RJV--"ENT OR AGENCY NUMBER <br />34-04-00 <br /> <br />,- <br /> <br />k'1ENDMENT # 6 <br /> <br />CONTRACT ROl!'!.!.NG NU~BER <br /> <br />LAND ACQUISITION <br />CONTRACT <br /> <br />'2'1. <br />THIS CONTRACT. made 'h~ ;75 day of 'JYJ 6'/7Ld <br />Slate of Colorado for the use and benefit of the Department of"1 Natural <br />(Colorado Water Conservation Board). <br />hereinafter rf'ferred fo as the State. and'2 Morrison-Knudsen Engineers, <br />180 Howard St.. San Francisco. CA 94105. <br />hereinafter referred fa as the contractor,/Contractor. <br /> <br />$ 15,000 <br />265,000 <br /> <br />Additional <br />Total Encumbrance <br />ff~' '1/37'rD <br />19" 91 . by and between the <br />Resources <br /> <br />Inc. , <br /> <br />, WHEREAS. authority exists in the Law and funds have been budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund Number 400 B . <br />G/l Account Number532?'X . Contract Encumbrance NumberC1535l0 : and <br />ABL Account No. 13222, Org. Unit 77-77-777, <br />WHEREAS. rel.Juired approval. clearance and coordination has been accomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract dated April 25. 1988. Contract Encumbrance Number <br />C-iS35l0 (hereinafter referred to as the "Original Contract"); <br />and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract amendment dated January 6. 1989 (hereinafter referred <br />to as the IIAmended Contract #111); and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract amendment dated May 9. 1989 (hereinafter referred to <br />as- the "Amended Contract #2U); and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract amendment dated December 29. 1989 (hereinafter <br />referred to as the 'IAmended Contract #3"); and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract amendment dated October 19. 1990 (hereinafter referred <br />to as the IIAmended Contract #411); and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract amendment dated December 28. 1990 (hereinafter. <br />referred to as the "Amended Contract #5/1); and <br /> <br />WHEREAS. Section 1 of Chapter 230. Session Laws of <br />Colorado. 1986. provides tha,t: "The COlorado water <br />conservation board may make loans. grants. or loans and grants <br />for the construction of each project specified in subsection <br />(1) of this section [includes the Towaoc Pipeline at an Owner <br />cost of six Million Dollars ($6.000.000)] from such moneys as <br />are or may hereafter become available to the Colorado water <br />conservation board construction fund. such loans. grants. or <br />loans and grants to be in the amounts listed in subsection (1) <br />of this section plus or minus such amounts. if any. as may be <br />justified by reason of ordinary fluctuations in construction <br />costs as indicated by the engineering cost indices applicable <br />to the types of construction involved for such projects or as <br />may be justified by reason of changes made in 'the plans for a <br />project if those changes are required by final engineering <br />drawings and specifications or by federal or state <br />requirements"; and <br /> <br />WHEREAS. it is a State requirement that upon completion of <br />rhe Towaoc pipeline 'project. all right, title and interest in <br />and to the pipeline shall be conveyed by the State to the Ute <br />Mountain Ute Tribe; and <br /> <br />WHEREAS. the above requirement caused several of the land <br />owners to become more wary in the right-of-way negotiations <br />which caused a delay in the final negotiations; and <br /> <br />395-5301-1014 <br /> <br />. Page I of...2.... pages <br /> <br />3935E* <br />
The URL can be used to link to this page
Your browser does not support the video tag.