Laserfiche WebLink
<br />. .' 3 and Q30, 3 <br />Blue River. Are the Q-'7-,.,l-O- rates <br />adequate under present and future <br />conditions? <br />c. How much augmentation water is needed <br />to meet the present and future water <br />uses and to protect the instream uses <br />for the most critical stream reaches? <br />NOTE: This could be a graph showing <br />water needs vs. frequency of the need. <br />4. Augmentation Sources. <br />a. Review the existing operation of the <br />Goose Pasture Tarn. What operational <br />changes are possible so the reservoir <br />could be used in an optimum manner to <br />meet in-basin demands during the most <br />critical periods? What legal or other <br />institutional changes would have to be <br />made to change the operation of the <br />Tarn? <br />b. Review the cost and feasibility of <br />enlarging the capacity of the Tarn <br />concurrently with the reconstruction <br />of the spillway. How much additional <br />water is available from an enlarge- <br />ment? What is the cost? <br />c. Investigate the preliminary feasi- <br />bility of small reservoir sites in <br />