My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00335
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:42 AM
Creation date
10/5/2006 11:50:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153512
Contractor Name
Summit County
Water District
64
County
Logan
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Small Reservoir Feasibility Study <br /> <br />S-6 <br /> <br />Instream Flows <br /> <br />To evaluate needs for instream flow maintenance, the modeled. streamflow conditions in <br />critical reaches were compared to CWCB filings, negotiated curtailment and mitigation <br />thresholds, and flow rates incorporated into NPDES discharge permits, Table S-5 lists the key <br />reaches so examined, <br /> <br />Table 8-5 <br />Critical Instream Flow Reaches <br /> <br />North Fork Snake River <br />Snake River below North Fork <br />Blue River above Swan River <br />Blue River below Swan River <br />West Tenmile Creek below West Lake <br />Tenmile Creek above West Tenmile <br />Tenmile Creek above Officers Gulch <br />North Tenmile Creek below Frisco Town Ditch <br />Blue River below Dillon Reservoir <br />Blue River below Willow Creek <br /> <br />Under existing demands, modeled instream flows on nearly all critical reaches exceeded <br />the minimum requirements embodied in instream flow decrees, agreements, and discharge <br />permits, The few occasions when flows fell below minimum requirements were in dry years <br />when virgin hydrology was simply insufficient to meet the minimums, <br /> <br />Under ultimate demands, flows on the Snake River below Keystone snowmaking <br />diversions were frequently at the 2 cfs curtailment level and some snowmaking curtailments <br />were induced, Flows below Dillon Reservoir fell below 50 cfs in 5 year of the study period, <br />chiefly in November, when snowmaking exchanges are at their maximum levels, and in <br />February, when Dillon inflows are at their minimum levels, <br /> <br />Average monthly wintertime flows on Tenmile Creek above West Tenmile Creek <br />regularly fall below the Ql-IO values used as the basis for the NPDES permit for Copper <br />Mountain, Curtailment 0 snowmaking diversions via the Tenmile Creek pipeline would do little <br />to alleviate this apparent problem, since virgin flows are also often below the Q7-10 level. <br />Information obtained from the Colorado Department of Health shows that the Q7-10 flows for <br />the Copper Mountain plant are higher in January than in June, This counter-intuitive finding, <br />along with uncertainty about Climax operations which affect Tenmile Creek flows, suggest <br />further study is needed to verify whether this problem is real, <br /> <br />It should be noted that the basin model operates on a monthly time step. This <br />simplification tends to mask instream flow deficiciencies of shorter duration than a month. <br /> <br />Reservoir Levels <br /> <br />Because of their importance to the County recreational economy, Dillon Reservoir levels <br />under the baseline scenarios were computed from simulated storage contents, Generally <br />speaking, Dillon levels are near the targets defined in the Summit County Agreement except in <br />
The URL can be used to link to this page
Your browser does not support the video tag.