My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153509 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153509 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:21:47 AM
Creation date
10/5/2006 11:50:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153509
Contractor Name
Farmers Extension Ditch & Highland Lake Lateral Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />') <br />, <br /> <br /> (3) One 5 feet by 3 1/2 feet slide gate <br /> (4 ) six Parshall flumes <br /> (5) One 20.:t. feet of IO-inch diameter corrugated metal <br /> pipe (CPM) <br /> (6) One 26j: feet of IS-inch diameter CPM <br /> (7) One 532~ feet of 15-inch Polyvinyl Chloride (PVC) <br /> pipe <br />b. (1) One 1700~ feet of 6-inch diameter' drainpipe <br /> (2) One 3850~ feet of a-inch diameter drainpipe <br /> <br />c. Four check structures with 122.:t. cubic yards of <br />reinforced concrete at the following stations: <br />20+75, 29+50, 44+10, and 70+00 <br /> <br />d. 1772+ cubic yards of unreinforced concrete for ditch <br />lining between stations D+OO and 80+00 <br /> <br />e. 52,OOO.:t. cubic yards of embankment <br /> <br />f, 15,OOO~ cubic yards of topsoil <br /> <br />The deed will be recorded by the Contractor in the <br />proper county or counties and all recording fees shall be paid <br />by the Contractor. The retainage shall not be paid to the <br />Contractor until a warranty deed has been executed. recorded. <br />and filed with the Colorado Water Conservation Board. <br /> <br />6. Permit periOdic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State. manage. operate. and <br />maintain the project continuously in an efficient and <br />economical manner. and assume all legal liability for such <br />management, operation. and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's interest in the project facilities and <br />any other property identified in paragraph A.5. above. The <br />Contractor shall maintain general liability insurance covering <br />the management. operation. and maintenance of the project until <br />it completes repayment to the State in at least the following <br />amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence. the sum of Five Hundred Thousand Dollars <br />($500,000), <br /> <br />b. For any injury to two or more persons in any <br />single occurrence. the sum of One Million Dollars <br />($1,000,000). <br /> <br />said liability insurance shall name the State as a <br />co-insured. A copy of a certificate of said liability <br />insurance must be filed with the Colorado Water <br />Conservation Board prior to the start of the operation <br />of the project system. <br /> <br />8. Make the services of said project available within its <br />capacity to all persons in the Contractor's service area <br />without discrimination as to race. color. religion. or natural <br />origin at reasonable charges (inClUding assessments, taxes. or <br /> <br />Page 3 of 8 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.