My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00333
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:18 AM
Creation date
10/5/2006 11:50:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153524
Contractor Name
Redlands Water and Power Company
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />" <br /> <br />UUo;/UIU <br />,'U <br /> <br />,COLORADO WATER CONSERVATION BOARD <br /> <br />, <br /> <br />Redlands Rehab Project <br />Redlands W~ter and Power Company <br />March, 1989 <br /> <br />Introduction <br /> <br />The Redlands Water and Power Company (Company) is a mutual <br />share company which provides irrigation water to.all share <br />holders in the Company.' The Company currently provides <br />irrigation water to 22 ,farm and ranch units (2,056 acres) <br />which are engaged in commercial crop production and to 3,614 <br />acres of' suburban residences within the Redlands area. This <br />area is ~ocated on the southerly side of the Colorado River <br />adjacent to the southwesterly edge of Grand Junction. The <br />total number of people served by the Company is 7,000. <br /> <br />Problem <br /> <br />The Company's, water distribution system consists of <br />div'ersion-, conveyance, and pumpingfa.cilities; many of which <br />are in need of replacement or extens~ve rehabilitation. <br />Although the Company has an established 9peration, <br />m.intenance, and replacement program, the current needs for <br />rehabilitation are so extensive that this existing program is <br />inadequate to .take care of the work required. ' <br /> <br />Proposed Proiect <br /> <br />T~e Company contracted with ,Western Engineers, Inc, to <br />~rcpare ,a feasibility study, on the project. The study <br />identifies numerous problems with existing canals, sipbons, <br />flumes, ,pumping,stations, etc. and it .outlines a recommended <br />plan,to correct all these problems. The total estimated cost <br />of.the project is $2,960.000 (1989 price levels). However the <br />company proposes t,o construct the project in 3 phases, as <br />follows: . . <br /> <br />PhaSe 1 is proposed for 1989 at a cost of $840,000. <br />Phase 2 is proposed for 1994-1995 at a cost of $1.015,000. <br />Phase J is proposed for 1999-2006 at a cost of $1,105,000. <br />Proposed Financinq for Phase 1 <br /> <br />. The Company proposes to 'finance phase 1 by using. $420,000 <br />of its own reserves and horrowin~ $420,000 from the Board, <br /> <br />9501E <br />
The URL can be used to link to this page
Your browser does not support the video tag.