Laserfiche WebLink
<br />'.~ ~ <br /> <br />. <br /> <br />. <br /> <br />REDLANDS WATER AND POWER COMPANY <br /> <br />Irrigation Structures Feasibility Study <br /> <br />Western Engineers, Inc., staff and consultants to conduct the Feasibility <br />Study: <br /> <br />ENGINEERS <br /> <br />Study Manager and Engineer <br />Report Preparation <br /> <br />Arlan Feil <br /> <br />Hydraulic & Computer <br /> <br />John Currier <br /> <br />Electrical <br /> <br />Marston-Kenney <br />or Grant Moon <br /> <br />ENGINEERING TECHNICIAN <br /> <br />Data Collection & Area Calculations <br /> <br />Tom Gieck <br /> <br />DRAFTSMAN <br /> <br />Graphics,Charts & Plan Sheet <br />Drawings <br /> <br />Rodger Quinn <br /> <br />SURVEYOR <br /> <br />Reroute across Limekiln Gulch & <br />Preliminary Surveys <br /> <br />Rick Mason <br /> <br />SECRETARY <br /> <br />Report Preparation <br /> <br />Sue Rex <br />