My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00330
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:18 AM
Creation date
10/5/2006 11:50:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />il <br />'I Number <br />I 2.1 <br /> 3.1 <br />I 3.2 <br />3.3 <br />3.4 <br />I I 3.5 <br />3.6 <br /> 3.7 <br />I 3.8 <br />3.9 <br /> 3.9A <br />I 3.10 <br />3.11 <br />I <br /> 3.12 <br />I 4.1 <br /> 4.2 <br />I 4.3 <br />4.4 <br />4.5 <br />I 4.6 <br />4.7 <br /> 6.1 <br />I 6.2 <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LIST OF TABLES <br /> <br />Ti tl e Paqe <br />Summary of Towaoc Municipal Water Supply Recorr1s 2-2 <br /> <br />Estimated Towaoc Water Demand Peaking Factors 3-~ <br />Estimated Pipeline Flows for 1000 af/vear (in cfs) 3-7 <br />Flow/Volumetric Comparison 3-B <br />AWWA Recolllllended Fi re-Fl ows 3-9 <br />Elevations anr1 Design Hear1s Cortez to Towaoc Storage 3-12 <br />Tanks Half-Full Conditions <br /> <br />Tank Inflow Volumes Required for 10-Day Perior1 3-13 <br />Pi pe Si ze and Length 3-14 <br />Maximum Delivery Flow Rates 3-14 <br />Pipe Type Comparison 3-23 <br />Si zes by Pipe Type 3-44 <br />SUlllllary of Alternative Pipeline Estimated Costs 3-43 <br />Towaoc Pipeline Cost Estimates (Sheet 1 of 4) 3-47 <br />Towaoc Pipeline Cost Estimates (Sheet 2 of 4) 3-48 <br />Towaoc Pipeline Cost Estimates (Sheet 3 of 4) 3-49 <br />Towaoc Pipeline Cost Estimates (Sheet 4 of 4) 3-50 <br />Cost SUlllllary of Al i gnment and Si ze Opti ons 3-51 <br /> <br />Pressure Reducing Valve ~easured and Computed Values 4-3 <br />Recolllllended and Adjusted PRV Downstream Set Points 4-5 <br />Existing System Performance Summary 4-6 <br />Upper and Lower Pressure Zone Performance Summary 4-11 <br />New Loop Line Number 127 Performance Summary 4-15 <br />New Loop Lines 129 and 130 Performance Summary 4-17 <br />Cost Summary (Cateqories A through 0) 4-2B <br /> <br />Construction Fund Allocation Summary 6-4 <br />Potential L~ast Cost Summary ~-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.