Laserfiche WebLink
<br />I <br />I TOWAOC MUNICIPAL PROJECT <br /> FEASIBILITY REPORT <br />I TABLE OF CONTENTS <br />I Page <br /> 1.0 INTROOUCTION AND GENERAL INFORMATION 1-1 <br />I 1.1 General 1-1 <br /> 1.2 Project Authorization 1-3 <br />I 1.3 Scope 1-3 <br /> 1.4 History and Background 1-4 <br /> 1.5 Related Agreements 1-5 <br />I 2.0 WATER DEMAND 2-1 <br /> 2.1 General 2-1 <br />I 2.2 Historical Records 2-1 <br /> 2.3 Water Use Projections 2-3 <br />I 2.3.1 Population Projections 2-3 <br /> 2.3.2 Average Water Use Rates :>-3 <br /> 2.3.3 Peak Demand 2-7 <br />I 3.0 CORTEZ-TOWAOC PIPELINE 3-1 <br /> 3.1 Genera 1 3-1 <br />I 3.2 System Configuration 3-? <br /> 3.3 Pipeline Sizing 3-4 <br /> 3.3.1 Fire-Flows and Related Storage 3-8 <br />I 3.3.2 Other Storage Requirements 3-9 <br /> 3.3.3 Pipeline Hydraulics and Pipe Size 3-11 <br />I 3.4 Controls, Metering, Valving, and Drainage 3-15 <br /> 3.4.1 Controls 3-15 <br />I 3.4.2 Meteri ng 3-115 <br /> 3.4.3 Valving and Drainage 3-15 <br /> 3.5 Pipe Type and Class 3-17 <br />I 3.5.1 Pretensioned Concrete Cylinder Pipe 3-18 <br /> 3.5.2 PVC Pressure Pipe 3-19 <br />I 3.5.3 Fiberglass Pipe 3-20 <br /> 3.5.4 Ductile Iron Pipe 3-21 <br /> 3.5.5 Pipe Type Comparisons 3-22 <br />I 3.6 Geology 3-24 <br /> 3.7 Alignment Alternatives 3-27 <br /> 3.8 Rights-of-Way and Utility Interferences 3-34 <br />I <br />I <br />