My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00330
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:18 AM
Creation date
10/5/2006 11:50:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />N <br /> <br />1 <br /> <br />-----, <br />UTE I <br />MOUNTAIN I <br />L <br />UTE .., <br />RESERVATION J <br />r <br />I <br />L --l <br />Potentiol New Tonk I <br />(Upper Tonk I <br /> <br />L <br /> <br />Existing <br />650,000 --.... <br />gallon Tonk <br />(Middle Tonk) <br /> <br />Abandoned <br />1,000,000 <br />gallon tank,- <br />potential for <br />rehabilitation <br />(Lower Tonk) <br /> <br /> <br />Existing Row Woter <br />Supply Line from <br />Dolores Canol <br /> <br />- <br /> <br /> <br />Proposed Treatment <br />Plant Bypass <br /> <br />One of the Existing <br />Cortez Water <br />Supply Lines <br /> <br />Existing Cortez <br />~ / Treatment Plant <br /> <br />\ <br /> <br />Existing Treated <br />Water Storage Tank <br /> <br />,-Proposed Towaoc Water <br />Supply Line 19 to 23miles <br /> <br /> <br />"-- Air release valves, drain valves, <br />"'__and isolation valves will be <br />installed in the pipeline <br />at appropriate locations, <br /> <br />Potential New <br />-Pressure Zone <br /> <br />'-.. Proposed Flow <br />Control Station <br /> <br />(Not to Scale) <br /> <br />Potential Flow <br />Control Station <br /> <br />Existing Towaoc <br />Water Distribution <br />--- System <br /> <br />'-- Potential New <br />Pressure Zone <br /> <br />Towaoe Pipeline System <br />
The URL can be used to link to this page
Your browser does not support the video tag.