My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00330
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:18 AM
Creation date
10/5/2006 11:50:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.3.3 Peak Demand <br /> <br />Design flows for water supply systems are often as large ~s the estimated peak <br />day average usage. Demand fluctuations during the day are generally more <br />economically supplied from storage facilities located near the point of use <br />than from extra capacity in the primary water supply 1 i ne. Desi gni ng a water <br />supply line for less than the peak daily average flow is sometimes cost <br />effective, depending upon the relationships between incremental costs of <br />tennina1 storage near points of use and the costs of incremental pipeline <br />capacity. Consequently, once the average demand rate for a municipality is <br />detennined, the relationship between the average demand, peak demand, and <br />storage must be established to detennine the optimal pipeline design flow <br />rate. In this report, the ratio of the peak period flow rate to the annual <br />average flow rate is referred to as the peaki ng factor. Peaki ng factors must <br />have the peri od defi ned--such as monthly, weekly, daily, or hour1y--to fully <br />indicate the distribution of flow with time. <br /> <br />Many standard texts contain estimates of peaking factors. As presented by the <br />American Water Works Association (1952), the peaking factor for the peak daily <br />average flow for typical IJ. S. municipalities has been estimater\ to he in the <br />range of 1.5 to 2. O. Because those estimates were made fr'om r'eco..ds in the <br />northe~stern United States, they are not expected to be directly applicable <br />for a town such as Towaoc. Western cities can reach daily peaking factor's as <br />high as 3.0. <br /> <br />The Towaoc water allocation of 1000 af per year equates to a unifonn flow rate <br />of 1. 38 cfs or 620 gpm. Util i zi ng the maximum referenced peaki ng factor of <br />3.0, the maximum design the range of design flows for the pipeline is between <br />1.38 cfs and 4.14 cfs. The design flow and design peaking factor are <br />addressed in more detail in Chapter 3. <br /> <br />2-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.