My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00329
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:03:50 AM
Creation date
10/5/2006 11:50:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153370
Contractor Name
Dames and Moore
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />GEOLOGY <br /> <br />Senior Geologist <br />Project Geologist <br />Staff Geologist <br />Assistant Geologist <br /> <br />$17 <br />60 <br />46 <br />35 <br /> <br />SUPPORT <br /> <br />Secretarial <br />Drafting <br />Accounting <br />Clerical <br /> <br />$27 <br />30 <br />22 <br />17 <br /> <br />CONSULTANTS <br /> <br />Consultants <br /> <br />$59 <br /> <br />Travel by commercial ca~rier shall' be calculated at actual <br />cost plus a 10% handling charge. Travel by personal <br />automobile shall be calculated at the rate of 20 cents per <br />mile. All other expenses incurred shall be calculated at <br />actual cost plus a 10% handling charge. The Contraotor <br />shall be reimbursed at cost plus 10% for services of <br />consultants and subcontractors which' were obtained by the <br />Contractor. <br /> <br />9. The Contractor shall be compensated pursuant to this <br />paragraph 4 only to the extent that the Contractor and its, <br />consultants and subcontractors maintain reasonable written <br />records which provide evidence of the services actually <br />performed and expenses actually incurred. <br /> <br />5. It is understood and agreed that this contract is personal <br />in nature and may not be SOld, assigned, or otherwise transferred <br />to any other person or entity without the express written <br />approval of the State. ' <br /> <br />6. It is understood and agreed that the Contractor is an <br />independent consultant, nQt an employee, agent or representative <br />of the State. As such, neither the Contractor nor any of its <br />employees, nor any consultant retained by the Contractor, shall <br />receive any of the benefits of the State personnel system nor <br />have any claim therefor whatsoever. <br /> <br />7. The Contractor represents that the services to be ' <br />furnished under this contract will be in accordance with <br />generally accepted prOfessional practices. Any estimates of cost <br />of equipment, construction, ownership or operation furnished by <br />the Contraotor shall be the Contractor's opinion based upon its <br />professional judgment and experience. <br /> <br />8. J. William MCDonald, Director, Colorado Water Conservation <br />Board, Department of Natural Resources, shall be the State's <br />project manager for this contract. <br /> <br />A. AS such, he or his deSignee shall have the authority on <br />behalf of the State to act in matters concerning this <br />contract and to iSSue, in writing, directives to the <br />Contractor with regard to suoh matters as are specified to <br />be at, or are left at, the State's 'discretion pursuant to <br />the terms Of this contract. <br /> <br />B. He or his designee shall also have the authority to act <br />fOr the,State in making changes to Exhibit 8, Scope of . <br />Services, pursuant to the procedure for making such changes <br />which is set forth in,paragraph 9 below. <br /> <br />Page 1 of 8 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.