My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153379 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153379 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:45:21 AM
Creation date
10/5/2006 11:49:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153379
Contractor Name
Brook Forest Water District
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tion Board staff members and Dames & Moore staff members. <br /> <br /> <br />tabulations include the members of the study team. <br /> <br />The following <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. I <br />I <br />I <br />I <br />I <br />I <br /> <br />o Engineering designs and associated cost estimates, including capital, <br />operation, maintenance and replacement costs. <br /> <br />o Preparation of a comprehensive report which summarizes the work <br />completed during the study. <br /> <br />C. STUDY TEAM <br /> <br />The Hardin Dam Project Study team consisted of Colorado Water Conserva- <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />J. William McDonald <br />Director <br /> <br />David W. Walker <br />Deputy Director <br /> <br />Fred Daubert <br />Chief, Planning Section <br /> <br />Bill Green, P.E. <br />Hardin Dam Study <br />Project Manager <br /> <br />Emilie Ailts <br />Public Information <br /> <br />DAMES & MOORE <br /> <br />Key Personnel <br />Ulrich Kappus, P.E. <br /> <br />Function <br /> <br />Steve Hart, P.E. <br /> <br />Principal-in-Charge/ <br />Project Manager <br /> <br />Principal Investigator <br />Water Resources and Engineering <br /> <br />Civil Structures Design and <br />Cost Estimating <br /> <br />Principal Investigator <br />Design Review <br /> <br />Principal Investigator <br />Engineering Geology <br /> <br />Principal Investigator <br /> <br />Dam Design <br /> <br />I <br />'I <br />I <br />I <br />I <br /> <br />Doug Laiho, P.E. <br /> <br />John Rahe, P.E. <br /> <br />Anand Prakash, P.E. <br /> <br />Charles Logie, P.E. <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.