Laserfiche WebLink
<br />tion Board staff members and Dames & Moore staff members. <br /> <br /> <br />tabulations include the members of the study team. <br /> <br />The following <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. I <br />I <br />I <br />I <br />I <br />I <br /> <br />o Engineering designs and associated cost estimates, including capital, <br />operation, maintenance and replacement costs. <br /> <br />o Preparation of a comprehensive report which summarizes the work <br />completed during the study. <br /> <br />C. STUDY TEAM <br /> <br />The Hardin Dam Project Study team consisted of Colorado Water Conserva- <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />J. William McDonald <br />Director <br /> <br />David W. Walker <br />Deputy Director <br /> <br />Fred Daubert <br />Chief, Planning Section <br /> <br />Bill Green, P.E. <br />Hardin Dam Study <br />Project Manager <br /> <br />Emilie Ailts <br />Public Information <br /> <br />DAMES & MOORE <br /> <br />Key Personnel <br />Ulrich Kappus, P.E. <br /> <br />Function <br /> <br />Steve Hart, P.E. <br /> <br />Principal-in-Charge/ <br />Project Manager <br /> <br />Principal Investigator <br />Water Resources and Engineering <br /> <br />Civil Structures Design and <br />Cost Estimating <br /> <br />Principal Investigator <br />Design Review <br /> <br />Principal Investigator <br />Engineering Geology <br /> <br />Principal Investigator <br /> <br />Dam Design <br /> <br />I <br />'I <br />I <br />I <br />I <br /> <br />Doug Laiho, P.E. <br /> <br />John Rahe, P.E. <br /> <br />Anand Prakash, P.E. <br /> <br />Charles Logie, P.E. <br /> <br />1-2 <br />