My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153656 Application
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153656 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 3:04:22 PM
Creation date
10/5/2006 11:49:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153656
Contractor Name
Loloff Lateral Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />.' <br /> <br />. <br /> <br />. <br /> <br />4. Person to contact regarding this application _ <br /> <br />Name: James D. Eckha rdt <br /> <br />Position/title: President. Loloff Lateral Ditch Company <br /> <br />.... .., <br /> <br />.1.5. <br /> <br />-;':' <br />-')::;"'.r, .' <br />Kersev;:CO <br /> <br />80'644 . <br /> <br />. ~~', :~ _. ~:. ; ;, .;i:-.....; ,; <br />;", ," . - ..-_:~ '.~' ,,';"~'"'."". <br /> <br /> <br />. Mailing, address: 24205 WCR~7. <br />-.., " ',' ".,~.~' <br /> <br />. . S~\!'!~"- <br /> <br />Telephone number: ( <br /> <br />303 <br /> <br />) 356-1530 <br /> <br />S. Please provide a brief description of the owner's existing <br />water supply facilities. Describe any existing operational <br />or maintenance problems: <br /> <br />The water supply facility consists of 9,820 feet of concrete pipe, which <br />are in two-foot sections that were hand mortared at the joints. Pipe <br />diameter varies from 16" up to 24". <br /> <br />Because the system is about 65 years old we have experienced a lot of <br />deterioration of the mortared joints and cracking of the tiles, which has <br />resulted in leaks. We are unable to deliver the full amount of water to <br />each shareholder. The cement standpipes and air vents are also deteriorating <br />and in danger of collapsing and need to be replaced. Most of the dividing <br />boxes are too low to measure the water properly, so they need to be replaced. <br /> <br />Our customers' shares of Milton Reservoir water are delivered to the Loloff <br />Lateral pipeline through the Gilmore Canal. The Loloff Lateral then delivers <br />that water to each customer. Please see Exhibit B, Page 5 -- Map. <br /> <br />6 . <br /> <br />For existing <br />shareholders <br /> <br />fa~ilities indicate: (1) the number of <br />8 . or (2) the number of customers <br /> <br />served 6 <br /> <br />Note: The eight shareholaers own a combined total of 14~ shares of <br />stock. The six customers own a combined total of 770 acres which <br />are serviced by the lateral ditch. <br /> <br />Part B. - Project Description <br /> <br />1. Name'~f proj~ctor facility: <br />Loloff Lateral <br /> <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.