Laserfiche WebLink
<br />~- <br /> <br />:>. <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 9d <br />November 9, 1993 <br /> <br />2 <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. mAT A CONSTRUCTION FUND LOAN IN AMOUNT OF $97,500 (4%,20 <br />YEARS ) BE APPROVED FOR TIlE MICHIGAN RIVER WCD FOR TIlE <br />CONSTRUCTION OF AN ADDmONAL OUTLET ON THE MEADOW CREEK <br />DAM, and <br /> <br />2. mAT LOAN APPROVAL BE CONTINGENT UPON STAlE ENGINEER <br />ACCEPTANCE OF THE PLANS AND SPECIFICATIONS FOR <br />CONSTRUCTION OF TIlE ADDITIONAL OUTLET. <br /> <br />ACTION TAKEN BY TIlE CWCB BOARD <br /> <br />On November 9, 1993 the eweB Board took the following action, which was the <br />same as the StafT recommendation: <br /> <br />1. Approved A CONSTRUCTION FUND LOAN IN AMOUNT OF $97,500 ( 4%, <br />20 YEARS) FOR TIlE MICHIGAN RIVER WCD FOR THE CONSTRUCTION <br />OF AN ADDITIONAL OUTLET ON TIlE MEADOW CREEK DAM, and <br /> <br />2. Required mAT LOAN APPROVAL BE CONTINGENT UPON STAlE <br />ENGINEER ACCEPTANCE OF TIlE PLANS AND SPECIFICATIONS FOR <br />CONSTRUCTION OF TIlE ADDITIONAL OUTLET. <br /> <br />C:\wp51\9d119,cwc <br />