My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00315
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:49:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153324
Contractor Name
Breckenridge, Town of
Water District
0
County
Summit
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(e <br /> <br />. <br /> <br />7. Master Facilities Plan <br /> <br />a. <br />b. <br />c. <br /> <br />Initial improvements. <br />Ultimate improvements. <br />Construction cost estimates. <br /> <br />. <br /> <br />Procedures <br /> <br />1. Assembling Information <br /> <br />a. On-site investigation of existing facilities. <br /> <br />b. Obtain applicable reports and plans. <br /> <br />c. Discussions with in-house personnel. <br />District Administrator <br />Operations and Maintenance Superintendent <br />Attorney for the Di stri ct <br /> <br />d. Discussions with other related personnel and agencies. <br />Fire Chief of the Red, White & Blue Fire District <br />Summit County Planning Department <br />U. S. Forest Service <br />Breckenridge Sanitation District <br />Large land owners of undeveloped land within the <br />District <br />State and Local Departments of Health <br /> <br />2. Review collected data and compare with requirements. <br /> <br />3. Write and assemble report to answer the areas of investiga- <br />tion and other areas of importance as uncovered in the <br />information gathering stage or as required. <br /> <br />4. Review preliminary report with the District and the CWCB <br />s ta ff . <br /> <br />5. Modify report as required to complete. <br /> <br />Time Requirements <br /> <br /> Maximum <br />1. Assemble information 30 days <br />2. Review data 15 days <br />3. Assemble report 45 days <br />4 Review of report 15 days <br />5. Complete report 15 days <br /> Total 120 days <br /> <br />Note: With our first hand knowledge of the District, Items 1 and 2 may <br />be completed in 15 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.