Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />. <br /> <br />PROPOSAL <br /> <br />ENGINEERING fEASIBILITY STUDY <br />BLUE RIVER WATER DISTRICT <br /> <br />. <br /> <br />The following proposal <br />section as the scope. <br />following: <br /> <br />1. ,Assembl in'g information <br /> <br />for the study is as outlined below for each <br />The 'involvement for each section includes the <br /> <br />a. On-site investigation of existing facilities <br /> <br />b. Obtain previously prepared reports and plans <br /> <br />c. Discussions and coordination with in-house personnel <br />d. Discussion and 'coordination with related agencies <br /> <br />2. Review, organize and correlate collected data <br /> <br />3. Analyze, write and assemble report by sections <br /> <br />4. Report review and up-date <br /> <br />The proposal hours follow the general Outline for Feasibility Reports <br />as prepared by the Colorado Water Conservatlon Board. , " <br /> <br />Prefacing Material <br /> <br />04 hours <br />02 hours <br /> <br />Senior Project Engineer <br />Secretarial <br /> <br />$ 162.00 <br /> <br />Chapter I <br /> <br />Genera] Information <br /> <br />10 hours <br />02 hours <br />08 hours <br />06 hours <br /> <br />Senior Project Engineer <br />Project Engineer II <br />Technician/Draftsman I <br />See reta ri a 1 <br /> <br />$ 620.00 <br />