My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153954 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153954 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:49:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153954
Contractor Name
Leonard Rice Consulting Water Engineers
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />.tt <br /> <br />. <br /> <br />. <br /> <br />Exhibit A <br />Scope of Work <br /> <br />SPDSS Phase 1 and 2 <br />Consumptive Use and Water Budget Component <br />September 16,2002 <br /> <br />Introduction <br />Following is the Scope of Work for the Consumptive Use and Water Budget component of the <br />South Platte Decision Support System. The objectives of this scope of work are as follows: <br /> <br />1. To develop data, enhance and apply an existing consumptive use model, StateCU, to the <br />South Platte and North Platte River Basins that interacts with the State's central database <br />(HydroBase) and other SPDSS planning tools. <br />2. To develop data, enhance and apply an existing water budget model, StateWB, to the South <br />Platte and North Platte River Basins that interacts with the State's central database <br />(HydroBase) and other SPDSS planning tools. <br />3. To coordinate and share the Consumptive Use and Water Budget investigations with water <br />users, the State and other SPDSS contractors. <br /> <br />Table 1 lists the Phase I and Phase 2 activities that have been identified in the SPDSS Feasibility <br />Study (October 2001) to achieve these goals. The tasks will be performed by the Consumptive <br />Use and Water Budget Contractor, Leonard Rice Engineers, Inc. Task numbers listed in the <br />scope of work relate to the task numbers given to the entire SPDSS task items, shown in Table 1. <br />Note that the SPDSS Feasibility Study tasks shown in Table 1 were based on a data collection <br />phase being completed under separate funding from subsequent phases. The data collection <br />phase was subsequently combined with other phases, therefore, several of the tasks have been <br />combined in the following scope. As shown in Table 1, several of the tasks extend to Phase 3. <br /> <br />SPDSS Consumptive Use and Water Budget Component <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.