My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00313
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:49:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153416
Contractor Name
Basalt, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />VII-5 <br /> <br />! <br /> <br />Daily peak demands in mid-summer, therefore, could be in the range of <br /> <br />440,000 gallons per day at the present time. <br /> <br />Estimated consumptive use for present peak day water use' in Basalt is <br /> <br />estimated as follows: <br /> <br />TABLE VII-E <br /> <br />CONSUMPTIVE USE <br /> <br />Use <br /> <br />Gallons per Capita <br />per Day <br /> <br />Percentage of <br />Daily Requirement <br /> <br />Domestic and Municipal <br /> <br />6 <br /> <br />5 <br /> <br />I rri gat i on <br /> <br />115 <br /> <br />50 <br /> <br />Leakage <br /> <br />100 <br /> <br />Total <br /> <br />221 <br /> <br />At the present population of 1,000, this amounts to total consumptive <br /> <br />use of 221,000 GPO. <br /> <br />Present and projected water demands are shown in Table VI I-F. <br /> <br />! <br /> <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.