My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00313
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:49:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153416
Contractor Name
Basalt, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />WRIGHT-Me LAUGHLIN ENGINEERS <br />I:NQINl!IlAINQ tONeULTANT8 <br />....0 .\LCO'rT ST"IlIlT <br />DIlHYIUI, COL()ItADO .0111 <br />4:10:11 .......01 <br /> <br />COMPl.lETIIENGINlEIEAfNG IE"VICES <br />IN THE SPECIAL.TV "II[L.DS Oil'" <br />WATIER SU....LV AND DISTAIBUTION <br />WATER AND SEWAGE T"EATMlENT <br />SEWAGE CDLI.I::CTION AND 1'II::USII: <br />INDUSTRIAL WASTES <br />STORM ORAINAGi: <br />I"LDOD CONTROL. AND <br />OTHER WAVER.ORIENTED PROJECTS <br /> <br />flON"LD C Mrl_AlIr.ULIN <br />= KIIlNNETH R. WHIGtiT <br />H"Lf-OttD I[ I.RILK'>ON <br />DOUGl.AS T. SOVERN <br />JOHN T. MrL""U: <br />WILLIAM C. TAGGART <br /> <br />THO""'" W. MOIfHIS <br />JIMMie O. WHIT"IELD <br /> <br />......N O~ ...,,:. <br />... O. DO" IOU <br />.......N, <:01..0....00 '18" <br /> <br />IlV.""".O'l,T 0"" 'C. <br />... O. Dt;I. 'UO <br />STIl",MDOAV \/11..""\0"-, COI.O....go .on. <br /> <br />DILLON ../1.101. 0....1<:. <br /> <br />......co, COLO....OO 'O..S <br /> <br />October 7, 1977 <br /> <br />Ms. Linda Crossland, Mayor <br />Board of Trustees <br />Town of Basalt <br />P. O. Box 1046 <br />Basalt, Colorado 81621 <br /> <br />RE: Feasibility Report on Water System <br />Improvements for Colorado Water <br />Conservation Board <br /> <br />Gentlemen: <br /> <br />: <br /> <br />Submitted attached is our Feasibility Report, Water System Improvements, <br />for the Town of Basalt, Eagle COunty, Colorado and the Colorado Water <br />Conservation Board. This report details the history of water use in <br />Basalt, evaluates the present water system, explains the necessity <br />for improvement, proposes the cOnstruction and repair projects which <br />will achieve this improvement, and shows that it Is financially <br />feasible for the Town of Basalt to undertake this project with certain <br />assistance. <br /> <br />. <br /> <br />The estimated cost of the total project is $1,212,806. The Town of <br />Basalt Is prepared to contribut~ $200,000. This amount is to be <br />matched by a proposed FHA grant, and a proposed Four Corners Region <br />grant will provide $120,000. A 40-year loan at 5 percent by the <br />FHA will provide $90,000. The remaining $600,000 Is to be fInanced <br />using a CWCB advance amortized ~ver 40 years. <br /> <br />We will be available for further information or discussion upon request. <br /> <br />~espectfully submitted, <br /> <br />~ <br /> <br />8-27 <br /> <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.