Laserfiche WebLink
<br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br /> <br />D. Financial Status <br />Copies of Ish Reservoir Company's financial statements for years ending <br />January 31, 1986 and January 31, 1987 are shown in Appendix A, pages A-19 <br />through A-22. These statements are an accurate representation of the financial <br />condition of the Ish Reservoir Company and are the only statements which the <br />Company has. <br />The loan described as "Wichita Bank loan" is through Farm Credit Services <br />and will be paid off in 1993. The purpose of the borrowed money was to <br />reconstruct the measuring station at the lower end of New Ish Ditch, repair work <br />at the diversion structure from the Little Thompson, improvements to the <br />measuring flume from Ish Reservoir to New Ish Ditch, and miscellaneous main- <br />tenance. The payment schedule for this loan is shown in Appendix A, page A-23. <br /> <br />E. Physical Assets <br />1. Existing facilities and condition. <br />The existing facilities of the Ish Reservoir Company include the diver- <br />sion structure from the Little Thompson, inlet ditch, bypass headgate <br />for Colorado Big Thompson project water, the reservoir with dams at the <br />northwest and southeast, the outlet works for New Ish Ditch, (the outlet <br />works for Old Ish are the responsibility of the Boulder and Larimer <br />County Irrigating and Manufacturing Ditch Company) various headgates to <br />serve farm laterals, and the gaging station just east of Thomas <br />Reservoir. These features are shown on the map on the following page. <br /> <br />The northwest dam on Ish Reservoir needs improvements in the form of the <br />installation of a toe drain, for which this funding application is being <br />made. The remainder of the facilities are in very good condition, with <br />significant maintenance and repair work completed on the diversion <br />structure from the Little Thompson, New Ish Ditch outlet flume, and the <br />gaging station at the bottom of the system in the last several years. <br /> <br />JL _ l_L~,' <br /> <br />I,d I <br /> <br />-10- <br /> <br />~I <br />..;.n;ll <br /> <br />L. <br />